|
|
|
Key Personnel
Managing Director
Eng. U Aung |
U Aung graduated from Rangoon Institute of
Technology as a civil engineer in 1978. Responsible for the development of company both for its resources and their work
capacity; coordination of the works of all units; quality assurance of NEPS's works.Planning, Management, Design and Construction Works of A & A Co., Ltd.Provide technical supports & assistance to the projects, by reviewing and checking of
technical design calculations and technical reports submitted by contractors. Discussion
& meeting with contractors and professional engineers to resolve the issues occurred
on site related to the technical matters. Conduct structural analysis and design for small
RC structures like foundation for Water Cylinder System and foundation & pump
chamber structure for Artwork Sculpture to be placed at Marina Barrage Area.
Checking of structural analysis and design for construction of boat lock and control
tower structures at Marina Barrage.
|
|
|
Senior Civil Engineer
Eng. U Khin Latt |
U Khin Latt with 45 years of engineering
experiences is the Senior Engineer of NEPS .He
graduated from Rangoon Institute of Technology
in 1965 and obtained a post graduate diploma in
Hydraulic Engineering from International
Institute for Hydraulic and Environmental
Engineering (IHE) Delft, the Netherlands in
1981. He was trained for irrigation system water
management and also as an irrigation network
designer and implementation engineer in New
England University, Armidale Australia (1986)
and by Sanyu Consultant Inc in Japan (1992).
He had been with the Irrigation Department for
over 34 years involving in design of earth dams,
irrigation and drainage system, flood control
embankments and their appurtenant structures. He
had designed the Yezin Irrigation System (Yezin
Dam Project, 1967 to 1974) which he had also
successfully implemented.
He had led the Lower Burma Paddy Land
Development Project 1. (Financed by World Bank)
survey group which involves providing
infrastructures for flood protection, drainage
system and navigation locks in the Irrawaddy
delta. The works include topographic survey,
location survey and proper-settings of drainage
structures according to design, covering a gross
area of more than 250,000 acres.
He was involved in the feasibility study and
implementation of many projects financed by
world bank, Asian bank and OECF like
(1) Final feasibility report of Pump Irrigation
Phase II (ADB Project)
(2) Final feasibility report of Yin Dam, Sadon
Dam and Lower Paddy Land Development Project
Phase III ( World Bank Project )
(3) Kinmuntaung Irrigation System Water
Management (World Bank) design and
implementation.
(4) South Nawin Dam QC, Irrigation System Design
and Implementation (OECF)
concerning design and planning of ID Project, he
had worked with various consultant, companies;
Halcrow U.L.G Ltd., SANYU Consultant and SMEC.
As an Irrigation Director, he has served as
Administrator, Designer, Planner and
Construction Engineer for years.
In 2003 he joined NEPS and became a counterpart
engineer and coordinator with Colenco Power
Engineer Co., Ltd.of Switzerland at Yeywa
Hydropower Project (YHPP). Since the start of
YHPP , he has been involved in the mix design
and implementation in Roller Compacted Concrete
(RCC). Now, he is the most experienced RCC
Quality Control Engineer in Myanmar who has
supervised the placement of over 2.4 million
cubic meter of R.C.C.
He has jointly written a paper in cooperation
with Dr. Malcom Dunstan, U Win Kyi and U Zaw Min
San on "Trial Mix Programme and Full Scale
Trials for Yeywa Hydropower Project, Myanmar"
which was presented at Bangkok Conference,
Thailand on 3rd December 2006 and at "5th
International Symposium on RCC Dam" at Guiyang,
China on 2nd and 4th November 2007.
At present he is a Director as well as an
Irrigation Network Designer at NEPS.
|
|
|
Senior Water Resources
Engineer
Eng. U Wai Phyo |
The structural engineer U Wai Phyo is a Civil
Engineering graduate of Rangoon Institute of
Technology in 1967. He joined the Irrigation
Department of Ministry of Agriculture and
Irrigation soon after graduation. He started as
an assistant engineer in 1967 and retired as a
director in 2007. He studied in Delft
University, Netherlands during 1974 on
deputation to earn a post graduate diploma in
hydrological engineering.
During his 40 years of service he served as a
design engineer for 15 years. During the tenure
as design engineer, he was involved in designs
of earth dams, RC spillways and medium-sized
hydraulic structures associated with irrigation
and drainage works. Then he had worked in Shwebo
District, Kachin State, Magway Division and Shan
State (South). The responsibilities were the
operation and maintenance of irrigation
structures, and design and construction of
village irrigation structures.
|
|
|
Senior Water Management Engineer
Eng. U Kyaw Thein
Assistant Project Coordinator/Laison Engineer |
U Kyaw Thein studied civil engineering at
Rangoon Institute of Technology and graduated in
1969.
For 39 years in government service, working
under different locations in Irrigation
Department, he has extensive knowledge and
experience on the operation and maintenance of
irrigation and drainage works in Yangon, Bago,
Mandalay and Sagaing Divisions along with the
construction experiences of 5 major dams in
Yangon, Mandalay and Sagaing Divisions.
As a director of planning and works branch in
the head office of the Irrigation Department
from 1998 to 2001, he was responsible for the
feasibility study and budget allocation for the
planning and works of national and regional
irrigation development schemes.
Recently, he is one of senior water management
engineers responsible for irrigation and land
development works in NEPS.
|
|
|
Senior Mining Engineer
Eng. U Kyaw Tint |
U Kyaw Tint is a mining engineer in
profession. He graduated from Rangoon Institute
of Technology in 1969 and got a Master of
Science in mining from University of Queensland,
Australia , in 1990. As a faculty member at
Yangon Institute of Technology he conducted
theory and practical courses to the mining
engineering students from 1970 to 1989. As a
freelance consulting mining engineer during 1989
to 1999 he conducted private consulting works
for local companies in the field of quarried
rock production, such as dimension stone
extraction, open pit coal mine design, gold
exploration at Thabeikkyin gold deposit,
Wet-they alluvial gold deposit exploration and
Pon Taung railway Tunnelling. From 2000 onward
he has worked as a Project Engineer, at Mahanwe
Mining and Construction Company, Yangon; as a
Mining Engineer at Myanmar Ivanhoe Holding
Limited (Gold Exploration) Yangon; as a Senior
Mining Engineer at Dragon Cement Company
Limited, Southern Shan States and presently as a
Project Engineer at NEPS.
|
|
|
Senior Engineering
Geologist
Eng. U Aye Ko |
U Aye Ko got his B.Sc (Engineering
Geology) from Rangoon Arts and Science
University in 1970. His wide area of work
experiences and practical knowledge as an
Engineering Geologist in Irrigation Department
spanning from 1970 to 1991 include: test
grouting, investigation and quality control of
earth filling works at North Nawin Dam Project
in cooperation with Consultant Engineers of
ENERGO PROJECT of Yugoslavia; various drilling
and grouting works at Sedawgyi Dam Project in
cooperation with Consultant Engineers of WAPCOS,
India; engineering geological investigation for
main dam, diversion dam and supervision and
planning of geotechnical works at South Nawin
Dam Project in cooperation with Consultant
Engineers of SANYU Consultants Inc of Japan. At
present he is responsible as a senior
engineering geologist for geological
investigation, supervision and quality control
of geotechnical works of NEPS.
|
|
|
Senior Water Resources
Engineer
Eng. U Aye Myint |
U Aye Myint is a civil engineer in profession
who graduated from Rangoon Institute of
Technology in 1972 and his academic knowledge
includes hydraulic works in deltaic areas after
he had studied in International Institute for
Hydraulic and Environmental Engineering (IHE) in
Delft, the Netherlands in 1983.
As a professional engineer, his 35 years of
working experiences in the Irrigation
Department, Ministry of Agriculture and
Irrigation, include investigation, planning,
design and implementation of reclamation, flood
control, drainage and tidal irrigation in
different lowland areas of Ayeyarwady delta,
Yangon division, Bago division and Mon states in
Myanmar. His later work experiences also include
operation and maintenance of different
irrigation and drainage facilities together with
rural development works situated both in lower
Myanmar and in border areas of remote hilly
regions of Chin and eastern Shan States in upper
Myanmar.
As a director of planning and works in the head
office of irrigation department from 2007 to
2009, he carried out financial analysis and
budget allocation for the operation and
maintenance of existing ID works and newly
formulated on - going project works.
His wide range of international experiences and
knowledge gained at the training workshop and
seminars on integrated water resources
management (IWRM) might enhance him in the wise
use and proper management of water resources in
different areas of water sector development in
Myanmar.
E-Mail: uamyint@gmail.com
|
|
|
Soil and Agro-Economics
Specialist
U Than Shwe |
U Than Shwe studied post graduate diploma in
Soil Survey in International Institute for
Geo-information Science and Earth Observation,
ITC, Enschede, the Netherlands in 1987. He
graduated from Rangoon Arts and Science
University, in 1978 and obtained a diploma in
Agriculture from State Agricultural Institute,
Pyinmana in 1969.
He had been a Deputy Director of Soil Survey in
Irrigation Department and 38 year in government
services. As the head of the soil survey
section, he evaluated and analysed problems
related to soil and socio-economic subject for
the department. He also prepared some papers for
the symposium and seminars held in the
department. He carried out as counterpart soil
and socio-economic survey to Snowy Mountain
Engineering Corporation (SMEC) of Australia in
Tank Irrigation Project, as well as with Nippon
Koei Co., Ltd. Japan in Yenwe-Pyuntaza
Irrigation Project. He also worked from 1970 to
1973 as a counterpart soil surveyor to FAO Soil
Expert in Sittaung Valley Development Project.
At present he is a soil and agro-economics
specialist at National Engineering and Planning
Services Co., Ltd ( NEPS ).
|
|
Senior Agronomist
U Nyo |
U Nyo took a post graduate diploma course
in soil survey in International Institute for
Geo-information Science and Earth Observation,
Enschede, the Netherlands in 1982.
He has been a senior soil scientist in the
Irrigation Department. He had professional
experience as Soil Scientist as well as
Agronomist for 39 years since he completed his
Diploma in Agriculture from State Agriculture
Institute, Pyinmana in 1968.
He has been assigned to many soil survey works
for irrigation projects in Myanmar, starting his
first assignment with Sittaung River Valley
Development Project financed by UNDP in 1970.
His recent experiences are in preparation of
agricultural statistics and socio-economic data
for the irrigation area and environmental
baseline study of water quality, ambient air and
ambient noise conditions for hydropower
development on Ayeyarwady River above Myitkyina
in 2009.
Considering such factors, U Nyo is proposed as
the most suitable professional for the Senior
Agronomist post for the proposed study.
|
|
Senior Wster Works
Engineers
Eng: Than Than Soe |
Daw Than Than Soe graduated from Rangoon
Institute of Technology with degrees, Bachelor
of Engineering ( Civil ) in 1976 and Master of
Engineering ( Water Resources and Development )
in 1978.
Her carreer spanned from 1977 to date as an
engineer in different government department
planning and design specializing especially in
the water supply, sanitation and drainage works
for urban cities. To name some of her carreer
works, she was an assistant engineer from 1977
to 1979 in Irrigation Department participated in
the design of irrigation and drainage system for
Lower Burma Paddy Land Development Project Phase
I & II financed by World Bank; an assistant
sanitary engineer in 1981-82 designing water
supply and sanitation works at water supply and
sanitation, planning division of Public Works
Corporation; as an assistant director from 1982
to 2003 in Urban Water Supply and Sanitation
Planning Division, Department of Human
Settlement and Housing Department, performing
feasibility studies, urban water supply and
sanitation for some settlements and towns all
over Myanmar and taking parting ground water
resources investigation works in the Department;
as deputy director from 2003 to 2010,
performing; the irrigation, planning design and
feasibility study for water supply, sanitation
and ground water resources; as director from
2010 to 2011 responsible for O&M of Parliament
Building complex; and currently as senior water
works engineer at NEPS.
|
|
Senior Civil Engineer
Eng. U Aung Kyaw Zan |
U Aung Kyaw Zan graduated from Rangoon Institute
of Technology in 1977. He has vast experience in
water resources development projects locally as
well as abroad.
He started his career as an irrigation and
drainage engineer in 1978 in Lower Burma Paddy
Land Development Project in Irrigation
Department, financed by the World Bank. He had
been responsible in carrying out design of
drainage, irrigation canals, flood embankments
and outfall hydraulic structures. Specifically,
he spent the majority of his professional time
on reclamation and drainage designs.
As overseas experience, he has worked with a
construction firm in Bangkok, Thailand in 1995
through 1998.
Since 1998, he was involved in several water
development projects designed and implemented by
NEPS consultants.
Based on 30 years tenure as drainage and
irrigation engineer in Myanmar and Thailand, U
Aung Kyaw Zan is proposed as a suitable
professional to be employed as Drainage Engineer
in the proposed project.
|
|
|
Senior Civil Engineer
Eng. U Win Swe |
U Win Swe is a civil engineer graduated from
Rangoon Institute of Technology in 1981. His
first assignment was a counterpart engineer to
Sanyu consultants in the design of South Nawin
Irrigation Project and Pump Irrigation and Area
Development Project from 1st October 1981 onward
in the Irrigation Department. His works also
included surveying and construction of
irrigation and drainage structures. He was also
assigned in the operation and maintenance of
Pump Irrigation and Area Development Project up
to 1990. His later works included the design and
construction of water supply for eight sugar
mills and ruby gem land in Myanmar. He was also
in charge of a construction team of the NEPS
company in pumping stations and treatment
plants, mini hydro power plants and bored pile
foundation works of some hydraulic structures in
different regions of Myanmar.
|
|
Senior Geomatic Engineer
U Myint Sann |
U Myint Sann has been working as a leader of
geomatic engineer, since NEPS had been
established. After he had finished his Bachelor
of Engineer (Civil) Course from Rangoon
Institute of Technology (RIT) in 1981, he joined
the Civil Engineers Construction Cooperative (RIT)
and served in topographic survey works. During
his service in NEPS, some of the topographic
survey works he had completed are Shwe Kyin
hydropower project (DHPI) dam site detailed map,
irrigable area topographic survey for Shwetaung
Co., Ltd., Tabak Hydropower Project topographic
map and topographic maps for many agricultural
land reclamation projects. One of his
challanging works is the completion of field
survey works and submission of results in
digital format to the client Katahira and
Engineers International of Japan within a very
limited time available in carrying out the
survey works for the existing road of about 70
km long and for a small hydropower scheme.
|
|
|
Computer System
Administrator
U Myat Min Latt |
U Myat Min Latt graduated from University of
Yangon in 1996. He started his computing and
information profession as a computer operator in
the Irrigation Department's Design branch,
computer section in 1992. He was involved in
several Irrigation projects as data processor
and assisted in the preparation of reports.
He joined NEPS as a computer system engineer in
1998 and contributed his expertise in several
water development and other projects as
computing & information technical support. He
gained a Bachelor of Science in Computing and
Information System Degree from London Guildhall
University in 2002.
His computing and planning skills were shown in
a challenging topographic survey project as an
IT team leader. Due to the time limitation the
survey team had to use several kinds of
measuring devices, digital and analog data and
different application to collect the data and
finally merge into a digital topographic map.
In 2003 he was assigned to Colenco Power
Engineering (CPE), as a NEPS counterpart staff
for Yeywa Hydropower Project (YHPP). CPE is the
designer and construction supervisor of the YHPP
in Myanmar. YHPP is the highest and biggest RCC
dam among south east Asia the installed units
capacity of which is 970 MW. As a computer
system & planning engineer he has established
and managed LAN and other IT relative devices,
has also developed and maintained several
database systems for drawing process and dam
instrumentation database of Yeywa for dam
monitoring in conjunction with CPE.
|
|
|
|
|
|