Project Name & Description |
Services Undertaken |
Location |
Client |
Progress |
Project Name |
Work Load |
State & Division |
Township |
Year |
Status |
|
|
Dams |
|
|
|
|
|
|
|
Spillway |
|
|
|
|
|
|
|
Conduits |
|
|
|
|
|
|
|
Hydraulic model study |
|
|
|
|
|
|
|
Irrigation canals |
|
|
|
|
|
|
|
Drainage canals |
|
|
|
|
|
Kabin Dam Project |
|
Kabin Dam Project for town
water supply
|
Tanintharyi |
Myeik |
Pyi Phyo Tun Co., Ltd. |
2009 |
P |
Provision of
Micro-Hydropower Facility |
5 kW x 8 nos. |
Airbase mini hydropower
|
Sagaing
|
Homalin |
Homalin Airbase |
2009 |
P |
Namtalon Micro-Hydropower
Project |
26 kV x 4 nos. |
Nan-talon mini hydropower
|
Sagaing |
Homalin |
Nanpaung Power Supply Co.,
Ltd. |
2009 |
P |
Yeywa Hydropower Project |
3550 GWh |
Yeywa hydropower project,
engineering and AutoCAD services |
Mandalay |
Mandalay |
Colenco Power Engineering
Ltd. |
2009 |
P |
Nyaungbininn Hydropwer
|
3kW x 2 nos. |
Nyaungbin in power scheme |
Bago |
Paukkhaung |
Nyaungninni Village |
2008 |
P |
Lubani Academy |
floor area 34000 sqft
|
Two storey RCC Lumbani
Academy |
Yangon |
Thingangyun |
Lumbani Group
|
2006 |
C |
Bwet Kyee Dam Project |
|
Bored pile foundation at
Thanbyla Chaung for irrigation flume structure
|
Magwe |
Aunglan |
Irrigation Department |
2006 |
C |
Wind generator Project |
500 kW |
Foundation for wind
generator |
Ayeyarwady |
Ngwe Saung, Pathein |
Thiri Lwin Co.
|
2006 |
C |
200 Ton per day Pulp Mill
Project |
200 ton per day |
Pump station, water
treatment plant, intake pipe line installation
and drainage |
Ayeyarwady |
Thabaung |
Ministry of Industry No.
(1) |
2005 |
C |
Great China Dormitory Blk
1 & 2 |
172 nos. |
RCC ground tank and bored
piles for dormitory building |
Yangon |
Mingalardon Industrial
Park |
Tokyo Enterprise |
2004 |
C |
Pataw Reservoir Project |
68 million gallons |
Pataw reservoir project |
Tanintharyi |
Myeik |
Pyi Phyo Tun Co., Ltd. |
2004 |
C |
|
|
network for water supply
pulp mill project |
Ayeyarwady |
Pyinywa, Myaungmya |
Ashin Eindaka, USA |
2003 |
C |
Loka Chan Tha Bridge |
100ft span/15ft width with
60 ft bored pile foundation |
Loka Chan Tha RCC bridge
with 100 ft span 15 ft width with 60 ft deep
bored piles |
Ayeyarwady |
Pyinywa, Myaungmya
|
Ashin Eindaka, USA |
2003 |
C |
Yeywa Hydropower Project |
3550 GWh |
Bottom outlet and spillway
concrete dam |
ITC, ID |
Bago |
Ministry of Electric
Power, Yeywa Hydropower Project, Mandalay |
2002 |
C |
Upper Paung Laung
Hydropower Project |
|
A storage type hydropwer
scheme involving a roller compacted condrete dam
(Hydraulic model study for buttom outlet and
spillway of the project.) |
ITC, ID |
Bago |
Ministry of Electric
Power, Upper Puang Laung Hydropower Project, Nay
Pyi Taw |
|
C |
Heap Leach Pad
Construction |
700 x 80 sqm |
8x nos of leach pad cell
|
Sagaing |
Monywa |
Soo-pin Co. |
1999 |
C |
|
|
Training program, piped
water supply system, water supply and sanitation
for rural water supply |
|
|
|
|
C |
Water Supply Project |
80000 gph |
Water supply |
Shan
|
Mongshu gemland |
Shan Yoma
|
1999 |
C |
Tebokan Agri Development |
45000 cuyd |
Earth dam
|
Magwe |
Salin |
Asia World Co. |
1999 |
C |
Water Supply for Suger
Mills |
10 million gal per day |
8 x sugar mill |
Central Myanmar |
|
WRUD |
1999 |
C |
Garment Factory
|
|
Garment factory for 300
sewing machines |
Yangon |
Hlaingtharyar |
Myanmar Guston Malinel
Co., Ltd. |
1999 |
C |