Project Name, Location and Description |
Client |
|
Services Undertaken |
|
Progress |
|
|
|
|
|
|
|
T |
Garment Factory |
Myanmar Guston |
|
Detailed Design and Construction |
|
Completed in |
|
- Hlaing Tharyar |
Molinel Co., Ltd. |
|
|
|
1999 |
|
A garment factory for |
|
|
|
|
|
|
300 sewing machines |
|
|
|
|
|
|
including canteen and |
|
|
|
|
|
|
office. |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Water Supply for Sugar Mills |
Water Resources |
|
Design and construction works |
|
Completed in |
|
- Central Myanmar |
Utilization Dept. |
|
for water supply of eight sugar |
|
1999 |
|
|
MOAI |
|
mills each having an average |
|
|
|
|
|
|
demand of 10 million gallon |
|
|
|
|
|
|
per day. |
|
|
|
|
|
|
|
|
|
T |
Heap Leach Pad Construction |
Soo-pin Co., Ltd. |
|
Consultancy services in contract |
|
Completed in |
|
Myanmar Ivanhoe Copper Co., Ltd. |
|
|
bidding. After award of contract, |
|
1999 |
|
- Monywa |
|
|
provision of resource persons |
|
|
|
Construction of 8 nos. of cells of |
|
|
and consultancy services for |
|
|
|
leach pad (700 m x 80 m) which |
|
|
project implementation. |
|
|
|
involves laying of impervious soil |
|
|
|
|
|
|
layer, HDPE liner, cushion and |
|
|
|
|
|
|
drainage layer. |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Water Supply Project |
Shan Yoma |
|
Investigation, Design and |
|
Completed in |
|
- Mongshu Gem land |
Co., Ltd. |
|
Construction Supervision |
|
1999 |
|
Water supply of 30000 gph for a |
|
|
|
|
|
|
net head of 850 ft by multi-stage |
|
|
|
|
|
|
pumps. |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Reclamation and Agricultural |
Myan Naing Myint |
|
Topographic Survey, Hydrological |
|
Completed in |
|
Land Development Project |
Co., Ltd. |
|
Investigation and Detailed Design |
|
1999 |
|
- Letpadan |
|
|
|
|
|
|
Development of 8000 acres of |
|
|
|
|
|
|
agricultural land which involve flood |
|
|
|
|
|
|
protection embankment, irrigation |
|
|
|
|
|
|
and drainage canal system, intake |
|
|
|
|
|
|
and drainage structures. |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Tebokan Agricultural Development |
Asia World |
|
Investigation, Design and |
|
Completed in |
|
Project |
Co., Ltd. |
|
Construction Quality Control. |
|
1999 |
|
- Salin |
|
|
|
|
|
|
Construction of an earth dam of |
|
|
|
|
|
|
45000 cu-yd for impounding of |
|
|
|
|
|
|
water for agricultural use |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Tabak Hydropower Project |
Kachin |
|
Feasibility Study, Site |
|
Completed in |
|
- Kachin State |
Independent |
|
Investigation works and Detailed |
|
2000 |
|
Run-of-river hydropower scheme |
Organization |
|
Design. |
|
|
|
of installed capacity 24 MW |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Some Engineering Services Undertaken (Continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Name, Location and Description |
Client |
|
Services Undertaken |
|
Progress |
|
|
|
|
|
|
|
T |
Study of Quarry Sites at Kalegauk |
Myan Naing Myint |
|
Topographic survey and geological |
|
Completed in |
|
Island |
Co., Ltd. |
|
study of quarries and jetty sites |
|
2000 |
|
- Ye, Mon State |
|
|
|
|
|
|
Production of breakwater armour |
|
|
|
|
|
|
stones. |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Kokang Rural Development |
Katahira and |
|
Topographic survey and |
|
Completed in |
|
Project |
Engineers Intl., |
|
geotechnical investigation works |
|
2001 |
|
- Northern Shan State |
Japan |
|
for the preliminary design. |
|
|
|
Improvement of the existing rural |
|
|
|
|
|
|
road of 74 km length and |
|
|
|
|
|
|
development of a small hydropower |
|
|
|
|
|
|
scheme. |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Leprosy Control and Basic Health |
JICA |
|
Review of Design and Quality |
|
Completed in |
|
Services Project |
|
|
Assurance. |
|
2001 |
|
- Mandalay |
|
|
|
|
|
|
Construction of training centre, |
|
|
|
|
|
|
dormitory and special skin clinic. |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Training Programme on Piped |
Community of |
|
Study on dam failure and finding |
|
Completed in |
|
Water Supply System |
Water Supply |
|
out remedial measures. Training |
|
2001 |
|
- Bawsaing village, Kalaw |
and Sanitation, |
|
to some CWSS staff on |
|
|
|
Rural water supply from a small |
UNDP |
|
implementation of mini dams. |
|
|
|
reservoir through pipeline system. |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Yeywa Hydropower Project |
a. Colenco Power |
|
a. Local counterpart to CPE for |
|
Completed in |
|
- Mandalay Division |
Engineering Ltd., |
|
engineering and AutoCAD |
|
2012 |
|
A storage type hydropower scheme |
Switzerland |
|
Services |
|
|
|
of 3550 GWh involving a roller |
b. Ministry of |
|
b. Hydraulic Model study for |
|
Completed in |
|
compacted concrete dam. |
Electric Power |
|
bottom outlet and spillway of |
|
2002 |
|
|
|
|
the project ( in cooperation with |
|
|
|
|
|
|
irrigation Technology Centre of |
|
|
|
|
|
|
Irrigation Department ) |
|
|
|
|
|
|
|
|
|
T |
Loka Chan Tha Bridge |
Ashin Eindaka |
|
Design and construction of R.C.C |
|
Completed in |
|
- Pyinywa, Myaung Mya |
residing at |
|
bridge including 60 ft deep bored |
|
2003 |
|
R.C.C bridge of 100 ft span and |
USA |
|
pile foundation work. |
|
|
|
15 ft width. |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Natdaung Reservoir Project |
Myan Naing Myint |
|
Topographic survey and geological |
|
Completed in |
|
- Myeik |
Co., Ltd. |
|
investigation of the reservoir area |
|
2003 |
|
An earth dam of 73 ft height |
|
|
and feasibility study. |
|
|
|
impounding 4000 ac-ft of water |
|
|
|
|
|
|
for town water supply. |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Shwegyin Hydropower Project |
Department of |
|
Prefeasibility study and |
|
Completed in |
|
- Shwegyin, Bago Division |
Hydroelectric Power |
|
hydrological investigation. |
|
2002 |
|
A storage type hydropower project |
Ministry of Electric |
|
Detailed topographic survey |
|
|
|
involving 207 ft earth dam and |
power |
|
of dam site. |
|
|
|
generating 200 GWh. |
|
|
|
|
|
Some Engineering Services Undertaken (Continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Name, Location and Description |
Client |
|
Services Undertaken |
|
Progress |
|
|
|
|
|
|
|
T |
Kun Hydropower Project |
Myanma |
|
Feasibility Study and Detailed |
|
Completed in |
|
- Phyu |
Electric Power |
|
Design. |
|
2003 |
|
Storage type hydropower scheme |
Enterprise |
|
|
|
|
|
of installed capacity 60 MW |
|
|
|
|
|
|
involving a 200 ft high rock fill dam. |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Pataw Reservoir Project |
Pyi Phyo Tun |
|
Investigation, feasibility study, |
|
Completed in |
|
- Myeik |
Co., Ltd. |
|
detailed design and construction |
|
2004 |
|
A 68 million gallon capacity |
|
|
supervision. |
|
|
|
reservoir for industrial and |
|
|
|
|
|
|
domestic water supply. |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Great China Dormitory Blk 1 & 2 |
The Tokyo |
|
Construction of bored pile |
|
Completed in |
|
- Mingalardon Industrial Park |
Enterprise |
|
foundation (172 no) and R.C.C |
|
2004 |
|
Dormitory Buildings and Ground |
|
|
ground tank. |
|
|
|
Tank construction for water supply. |
|
|
|
|
|
|
|
|
|
|
|
|
T |
200 Ton per day Pulp Mill Project |
Ministry of Industry No.(1) |
|
Construction works mainly in Area |
|
Completed in |
|
- Thabaung, Ayeyarwady Division |
|
|
5 of the Project which includes |
|
2005 |
|
Construction of pulp mill; design |
|
|
water intake pump station, supply |
|
|
|
and quality assurance by China |
|
|
water purification station and |
|
|
|
Metallurgical Construction (Group) |
|
|
effluent treatment plant. The |
|
|
|
Corporation (MCC) |
|
|
works involve about 22000 cu-m |
|
|
|
|
|
|
of reinforced concrete mostly of |
|
|
|
|
|
|
water tight structures. Also |
|
|
|
|
|
|
undertook installation of intake |
|
|
|
|
|
|
pipe line from river, some |
|
|
|
|
|
|
mechanical and electrical |
|
|
|
|
|
|
installation works, construction of |
|
|
|
|
|
|
pipe support bridge, pontoon |
|
|
|
|
|
|
bridge, drainage network and |
|
|
|
|
|
|
some insulation works. |
|
|
|
|
|
|
|
|
|
T |
Lumbani Academy |
Lumbani Group |
|
Construction including M & E |
|
Completed in |
|
- Thingangyun, Yangon |
|
|
works. |
|
2006 |
|
Two storey R.C.C building of floor |
|
|
|
|
|
|
area 34000 sq-ft. |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Wind Generator Project |
Thiri Lwin Co., Ltd. |
|
Design and construction |
|
Completed in |
|
- Ngwe Saung Beach |
|
|
supervision for wind generator |
|
2006 |
|
Installation of wind Generator of |
|
|
foundation. |
|
|
|
500 KVA capacity. |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Bwet Kyee Dam Project |
Irrigation Dept., MOAI |
|
Bored pile foundation at Thanbula |
|
Completed in |
|
- Aung Lan |
|
|
Chaung for irrigation flume |
|
2006 |
|
Construction of irrigation system |
|
|
structure. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Some Engineering Services Undertaken (Continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Name, Location and Description |
Client |
|
Services Undertaken |
|
Progress |
|
|
|
|
|
|
|
T |
Kabin Dam Project |
Pyi Phyo Tun Co., Ltd. |
|
Topographical survey, geological |
|
Completed in |
|
- Myeik |
|
|
investigation, detail design and |
|
2008 |
|
Construction of a reservoir for |
|
|
technical supervision in |
|
|
|
town water supply of Myeik |
|
|
construction works. |
|
|
|
extension. |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Upper Paung Laung Hydropower |
a. AF-Colenco Ltd. |
|
a. Local counterpart for engineering |
|
Ongoing |
|
Project |
Switzerland |
|
and AutoCAD Services |
|
|
|
- Mandalay Division |
b. Department of Hydro- |
|
b. Hydraulic model study for bottom |
|
Completed in |
|
A storage type hydropower scheme |
power Implementation |
|
outlet and spillway of the project. |
|
' Aug 2009 |
|
involving a roller compacted |
No.(1), Ministry of |
|
|
|
|
|
concrete dam |
Electric Power |
|
|
|
|
|
|
|
|
|
|
|
T |
EIA Special Investigation for |
China Power Investment |
|
Environmental Baseline Study of |
|
Completed in |
|
Hydropower Planning |
corporation (CPI) and |
|
the Project Area which includes |
|
Sep 2009 |
|
of Ayeyarwady River Basins |
Biodiversity And Nature |
|
Monitoring of surface water, |
|
|
|
above Myitkyina |
Conservation Association |
|
ambient air, acoustic environment |
|
|
|
- Caching State |
(BANCA) Myanmar. |
|
and pollution sources. |
|
|
|
Hydropower Generation |
|
|
|
|
|
|
by 7 Cascade Dams |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Water supply project |
MSC Co. Ltd., |
|
Investigation, Design and |
|
Completed in |
|
- Myeik |
The Republic of Korea |
|
Construction of water |
|
2010 |
|
Water supply and micro |
|
|
supply scheme |
|
|
|
hydropower scheme for |
|
|
|
|
|
|
an Industry |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Baluchaung No.(3) |
High Tech Concrete |
|
Hydraulic model study of Ht Intake |
|
Completed in |
|
Hydroelectric Power Project |
Technology Co., Ltd |
|
in cooperation with Irrigation |
|
Mar 2010 |
|
- Loikaw T.S, Kayah State |
|
|
Technology Centre |
|
|
|
A cascade Hydropower |
|
|
|
|
|
|
development providing 334 GWh/year |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Nacho Hydropower Project |
Department of Hydro- |
|
Hydraulic model study of spillway |
|
Completed in |
|
- Mandalay Division |
power Implementation |
|
in coopertion with Irrigation |
|
May 2010 |
|
A storage type hydropower scheme |
No.(1), Ministry of |
|
Technology Centre |
|
|
|
including concrete gravity dam |
Electric Power |
|
|
|
|
|
|
|
|
|
|
|
T |
Shwe Hlan Bo Region |
Water Resources |
|
Topographic survey of the area and |
|
Completed in |
|
Greening Project |
Utilization Department, |
|
Final Design of Irrigation and |
|
Oct, 2010 |
|
- Kyaukse T.S, Mandaly Division |
MOAI |
|
Drainage System |
|
|
|
To develop irrigable |
|
|
|
|
|
|
area of 8750 acres |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Kankalay Pump Irrigation Project |
Water Resources |
|
Topographic survey works and Final |
|
Completed in |
|
- Hmawbi T.S, Yangon Division |
Utilization Department, |
|
Design of the Irrigation Scheme |
|
Dec 2010 |
|
To develop irrigable |
MOAI |
|
|
|
|
|
area of 4500 acres |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Mandalay City Flood |
Irrigation Department |
|
Preliminary survey and design |
Completed in |
|
Mitigation Master Plan |
Ministry of Agriculture |
|
for the master plan including |
Jan, 2011 |
|
- Mandalay |
and Irrigation |
|
design of flood ways for |
|
|
|
|
|
|
Mandalay east area. |
|
|
Some Engineering Services Undertaken (Continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Name, Location and Description |
Client |
|
Services Undertaken |
|
Progress |
|
|
|
|
|
|
|
T |
Thilawa Economic Zone Project |
Department of Human |
|
Investigation and conceptual |
|
Completed in |
|
- Thanlyin Township, Yangon |
Settlement and |
design for a drainage and flood |
Jul, 2011 |
|
|
Housing Development |
|
control system for a special |
|
|
|
|
|
economic zone of 15000 ac |
|
|
|
|
|
lying along a tidal river |
|
|
|
|
|
|
|
|
T |
Kubyin Diversion Weir Project |
Shwe Taung |
|
Construction and Quality |
|
Completed in |
|
- Thazi T.S, Mandalay Division |
Development Co., Ltd. |
|
Control of a concrete |
|
May, 2011 |
|
Construction of a diversion weir |
|
|
diversion weir |
|
|
|
for piped water supply to |
|
|
|
|
|
|
Cement Factory |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Irrigation Development of |
Irrigation Department, |
|
The Consultancy Services for the |
|
Completed in |
|
Phyu-chaung Dam Multi-purpose |
Ministry of Agriculture |
|
Feasibility Study and Preliminary |
|
Jul 2011 |
|
Project |
and Irrigation (MOAI) |
|
Engineering Design in Association |
|
|
|
- Phyu T.S, Bago Division |
|
|
with SANYU CONSULTANTS INC, |
|
|
|
To develop an irrigable area |
|
|
Japan. |
|
|
|
of about 40,000 ha. |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Preservation of Farming Area |
Consortium of |
|
a. Inventory Survey on Polder Dike |
|
Completed in |
|
for Urgent Rehabilitation of |
Sanyu Consultants |
|
and Existing Sluice Gate |
|
Mar, 2010 |
|
Agricultural Production and |
Inc. and Nippon |
|
|
|
|
|
Rural Life in Areas affected |
Koei Co., Ltd. |
|
b. Geological Survey and Soil |
|
Completed in |
|
by Cyclone Nargis |
Japan |
|
Mechanical Investigation |
|
Mar, 2010 |
|
- Ayeyawady Division |
|
|
|
|
|
|
A project granted by JICA |
|
|
c. Construction Supervision |
|
Completed in |
|
for Cyclone Nargis affected area. |
|
|
of Model Embankment |
|
May, 2010 |
|
|
|
|
|
|
|
|
|
|
|
d. Construction Supervision of Dike |
|
Completed in |
|
|
|
|
Embankment and Sluice Gate |
|
Apr, 2011 |
|
|
|
|
Rehabilitation |
|
|
|
|
|
|
|
|
|
|
|
|
|
e. Topographic Survey Work of |
|
Completed in |
|
|
|
|
Polder Dike |
|
Nov, 2011 |
|
|
|
|
|
|
|
T |
Mya Sein Yaung Industrial |
Shwe Taung |
|
Investigation and Conceptual |
|
Completed in |
|
Estate |
Construction Co., Ltd. |
Design for Drainage and Flood |
2012 |
|
- Hlaingtharyar Township |
|
|
Control for Industrial Estate |
|
|
Yangon Region |
|
|
|
|
|
|
|
|
|
|
|
T |
EIA and SIA Study for |
High Tech Concrete |
|
EIA and SIA Study Report including |
|
Completed in |
|
Baluchaung 3 Hydropower |
Technology Co., Ltd. |
Assessment on Environmental Flow |
Jul, 2012 |
|
Project |
|
|
Flora, Fauna, Fishery and Socio |
|
|
- Lawpita, Kayah State |
|
|
Socio-Economic Study |
|
|
|
|
|
|
|
|
T |
Latpan Pump Irrigation Project |
Water Resources Utilization |
|
Topographic survey and design of |
|
Completed in |
|
- Hlegu T.S, Yangon Division |
Department, MOAI |
|
pump irrigation system |
|
Aug, 2012 |
|
|
|
|
|
|
|
T |
Meiktila Plain Pump Irrigation |
Water Resources Utilization |
|
Design of flood protection and |
|
Completed in |
|
Project |
Department, MOAI |
|
Drainage works planning and |
|
Nov, 2012 |
|
- Wandwin T.S, Mandalay Division |
|
|
design works for water extraction |
|
|
|
|
|
|
by caisons |
|
|
Some Engineering Services Undertaken (Continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Name, Location and Description |
Client |
|
Services Undertaken |
|
Progress |
|
|
|
|
|
|
|
T |
Yaybudalin Pump Irrigation |
Water Resources Utilization |
|
Topographic survey and remodelling |
|
Completed in |
|
Project |
Department, MOAI |
|
of existing irrigation system |
|
Dec, 2012 |
|
- Monywa T.S, Sagaing Division |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Environmental and Local |
Electric Power |
|
- Survey on Environmental |
Completed in |
|
Community Survey for |
Development Co., Ltd. |
|
Laws and Regulations for |
Jan, 2013 |
|
Feasibility study on small Scale |
( J-Power) |
|
Hydropower Development |
|
|
Hydropower Development with |
Japan |
|
- Social Survey on Local |
|
|
Existing Irrigation Dams in Myanmar |
|
|
Community |
|
|
- Bago and Ayeyarwady Division |
|
|
|
|
|
|
|
|
|
|
|
T |
Preparatory Survey for |
Sanyu Consultants Inc. |
|
Screening, Preliminary |
Completed in |
|
Environmental and Social |
Japan |
|
Environmental Review and |
Feb, 2013 |
|
Considerations |
|
|
Formulation Draft Monitoring Plan |
|
|
- Yangon Division |
|
|
|
|
|
Thilawa Special Economic Zone |
|
|
|
|
|
|
|
|
|
|
|
T |
Inventory Survey of Existing Wells |
Sanyu Consultants Inc. |
|
- Digitalization and Creating |
Completed in |
|
Data Collection Survey on Water |
Japan |
|
a database of existing Well Data |
|
May, 2013 |
|
Resources Potential for Thilawa |
|
|
- Questionnaire and Field Inventory |
|
|
|
Special Economic Zone and |
|
|
Survey on Facilities of each |
|
|
Adjoining Areas |
|
|
Existing Well |
|
|
|
|
|
|
|
|
T |
EIA and SIA Study for POL |
Collective Companies, |
|
In Association with Norconsult |
Completed in |
|
Storage and Port Facilities |
Myanmar Petroleum |
|
of Norway Study on EIA and SIA |
May, 2013 |
|
Project |
Trade Association |
|
of the Project Including |
|
|
- Yangon Division |
|
|
Baseline Conditions, Environmental |
|
|
Thilawa Special Economic Zone |
|
|
Risks and Concerns, Mitigation, |
|
|
|
|
|
Management and Monitoring |
|
|
|
|
|
|
|
T |
Hydrological Survey and Water |
Sanyu Consultants Inc. |
|
- Ground Water Level and Quality |
Completed in |
|
Quality Monitoring |
Japan |
|
Survey |
May, 2013 |
|
- Yangon and Bago Division |
|
|
- Installation of River Gauging |
|
|
Data Collection Survey on Water |
|
|
Station, River Discharge Survey |
|
|
Resources Potential for Thilawa |
|
|
and Topo-Survey |
|
|
Special Economic Zone and Adjoining Areas |
|
|
- Surface Water Quality Survey |
|
|
|
|
|
|
T |
Environmental and Social Impact |
Norconsult, Norway |
Environmental and Social Impact Assessment |
|
Completed in May 2013 |
|
Assessment for the World Bank |
|
|
Project of Upgrading Thaton |
|
|
Gas Turbine Project |
|
|
- Thaton, Mon State |
|
Some Engineering Services Undertaken (Continued) |
|
|
|
|
|
|
|
|
|
|
|
|
Project Name, Location and Description |
Client |
|
Services Undertaken |
|
Progress |
|
|
|
|
|
|
T |
Sustainable Management of |
International Water |
|
Collection of biophysical data, |
Jun, 2013 |
|
Water to Improve Food Security |
Management Institute |
|
relevant information on the |
|
|
and Livelihoods in the Dry Zone |
|
|
Dry Zone |
|
|
|
of Myanmar |
|
|
Assistance in field visits and |
|
|
|
- Mandalay, Magway and |
|
|
related workshops. |
|
|
|
Sagaing Division |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Linear and Topographic Survey |
Sanyu Consultants Inc. |
|
Longitudinal linear and cross |
Completed in |
|
for Existing Irrigation Systems |
|
|
section survey of existing |
Aug, 2013 |
|
- Pyay and Thayawaddy Township, |
|
|
canals and access roads and |
|
|
Bago Division |
|
|
topographic survey of model |
|
|
|
|
|
farms |
|
T |
Village Water Supply System |
Village Development |
|
Renovation of existing water |
Completed in |
|
Construction Project |
Committee of |
|
ponds and appurtenant |
Aug, 2013 |
|
1. Chauk Township |
corresponding villages |
|
structures including silt trap, |
|
|
2. Myaing Township |
through Japanese |
|
water supply pipe system |
|
|
3. Kawhmu Township |
Embassy |
|
|
|
|
|
|
|
|
|
|
T |
A Mini-Study of the Potential |
UNOPS and |
|
Explore existing irrigation canal |
Completed in |
|
of Rehabilitation of Canal |
Livelihoods and Food |
|
systems, farmers' participation |
Aug, 2013 |
|
Systems in Gravity Irrigation |
Security Trust Fund |
|
and options for improvement of |
|
|
|
Schemes in the Dry Zone |
(LIFT) |
|
management. |
|
|
|
|
|
|
|
|
|
T |
Rehabilitation Irrigable Network |
Sanyu Consultants Inc. |
|
Topographic Survey Work for |
Completed in |
|
of North Nawin, South Nawin, |
|
|
Canals Rehabilitation for 4 |
|
2013 |
|
Taungnyo, Wegyi Dams ( 4 Dams) |
|
|
Irrigation Command Areas |
|
|
- Tharyarwady Township, Pyay District |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Seik Nyan Pump Irrigation |
Water Resources Utilization |
|
Design of Flood Protection & |
Completed in |
|
Project |
Department, MOAI |
|
Drainage Works Planning and |
|
2013 |
|
- Mandalay Region |
|
|
Design Works for Water |
|
|
|
|
|
Extraction |
|
|
|
|
|
|
|
|
|
T |
Saw Chaung Hydropower Project |
Myat Noe Thu |
|
Topographical, Hydrological |
Completed in |
|
- Kanpetlet Township |
Construction Co., Ltd. |
|
and Geological Investigation |
2014 |
|
Run-of the river type hydropower |
|
|
Feasibility Design |
|
|
|
scheme generating 2 MW. |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Rubber Factory Project |
Max Myanmar Co., Ltd |
|
Initial Environmental Examination |
|
Completed in 2014 |
|
- Belin, Mon State |
|
|
|
|
|
|
|
|
|
T |
Shoe Factory Project |
Tian Yu International Co., Ltd |
|
Initial Environmental Examination |
|
Completed in 2014 |
|
- Hlainhtharyar Township, |
|
|
|
Yangon Region |
|
|
Some Engineering Services Undertaken (Continued) |
|
|
|
|
|
|
|
|
|
|
|
|
Project Name, Location and Description |
Client |
|
Services Undertaken |
|
Progress |
|
|
|
|
|
|
|
T |
Mandalay Myotha Industrial |
Mandalay Myotha Industrial Development Public Company Limited |
|
Design of Land Preparation, Road Formation and Storm Water Drainage Design for Causeway, Culverts and Road Side Drain on Port Link Road, Design of Dam and Water body for Initial Phase, Area, Design for general Cargo Yard and Ramp on Semeikkon Port
|
|
Completed in Aug, 2014 |
|
Development Project |
|
|
|
- Myingyan Township, |
|
|
|
Mandalay Region |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T |
Okkan Sugar Factory Project |
Golden Myan-Tai Co.,Ltd |
|
Environmental and Social Impact Assessment |
|
Completed in July 2015 |
|
- Taikkyi, Yangon Region |
|
|
|
|
|
|
|
|
|
T |
Hydrology Study of the Minbu |
Green Earth Power (Thailand) Co., Ltd. |
Hydrology Study Report for Minbu Solar Plant Area |
Completed in Aug, 2015 |
|
Solar Plant Project Area |
|
- Minbu, Magway Region |
|
|
|
|
|
|
T |
Preliminary EIA (Environmental |
SN Power Invest Asia Pte. Ltd. of Singapore |
Initial Environmental Impact Assessment |
|
Completed in 2015 |
|
Impact Assessment) on Middle |
|
|
Yeywa Hydropower Project (2015) |
|
|
- Naungcho Township, Shan State |
|
|
|
|
|
|
|
|
T |
ShukhinThar Jetty Project |
Myatnothu Co., Ltd |
|
Initial Environmental Examination |
|
Completed in 2015 |
|
- Thaketa Township, Yangon Region |
|
|
|
|
|
|
|
|
|
T |
Concrete Production Project |
High Tech Concrete Co., Ltd |
|
Initial Environmental Examination |
|
Completed in 2015 |
|
- Thaketa Township, Yangon Region |
|
|
|
|
|
|
|
|
|
T |
Timber Factory Project |
Manawphyu Co., Ltd |
|
Initial Environmental Examination |
|
Completed in 2015 |
|
- Kyimyindine Township, |
|
|
|
Yangon Region |
|
|
|
|
|
|
|
|
|
T |
Flood Mitigation of Yangon City |
Yangon City Development Committee |
- |
Topographic Survey Work for |
|
Completed in 2015 |
|
Downtown Area |
|
existing roads and drains of 6 |
|
|
- Puzuntaung , Botahtaung , |
|
township of Yangon City |
|
|
Kyauktada, Pabetan, Latha and |
- |
Preliminary Design of Storm |
|
|
Lamadaw Tsps, Yangon Region |
|
Water Drains and other related |
|
|
|
|
|
Structures |
|
|
|
|
|
|
|
|
|
T |
Drainage Assessment for HAGL |
HAGL Co., Ltd |
|
Design of Storm Water Drains and other related Structures |
|
Completed in 2015 |
|
Myanmar Plaza Development |
|
|
|
- Yankin Tsp, Yangon Region |
|
|
|
|
|
|
|
|
|
T |
Kyaington Hydropower Project |
Kyaington Electrical Co., Ltd. |
|
Topographic Survey, Hydrological Investigation and Geological Investigation |
|
Completed in 2015 |
|
- Kyaington Township, |
|
|
|
East Shan State |
|
|
|
|
|
|
|
|
|
T |
Kyauk Phyu Reservoir Project |
GE |
|
Topographical, Hydrological and Geological Investigation, Reservoir and Spillway Design and Cost Estimate |
|
Completed in 2015 |
|
- Yakhine State |
|
|
|
|
|
|
Some Engineering Services Undertaken (Continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Name, Location and Description |
Client |
|
Services Undertaken |
Progress |
|
|
|
|
|
|
|
T |
Twingyi Pump Irrigation Project |
Water Resources Utilization |
|
Topographic Survey and Design of Pump Irrigation System |
|
Completed in 2015 |
|
|
Department, MOAI |
|
|
|
|
|
|
|
|
|
T |
Monywa Drainage Survey Project |
Monywa Township Development Committee |
|
Topographic Survey |
|
Completed in 2015 |
|
- Monywa Township, Sagaing Region |
|
|
|
|
|
|
|
|
|
T |
Drainage Projects for (2012-2016) |
Department of Human Settlement and Housing Development |
|
Investigation and Conceptual Design for Drainge and Flood Control System |
|
Completed in 2015 |
|
- Thanlyin Township |
|
|
|
- Kyi Su Village |
|
|
|
- Zawtika Housing |
|
|
|
|
- Kyibwaye Housing |
|
|
|
|
- Dagon Seikkan Township |
|
|
|
|
- Lower Price Building |
|
|
|
|
- Nyaung Ywa |
|
|
|
|
- Dine Su, Hlaingtharyar Township |
|
|
|
|
- Shwe Lin Ban, Hlaingtharyar Township |
|
|
|
|
- Kyan Pyo, Hlaingtharyar Township |
|
|
|
|
- Yuzana Housing, South Dagon Township |
|
|
|
|
- Kyar Gyi, South Dagon Township |
|
|
|
|
- Aye Yar Wun Housing, Dagon Seikkan Township |
|
|
|
|
- Yoma Housing |
|
|
|
|
Yangon Region |
|
|
|
|
- Ohn Mar Dandee |
|
|
|
|
Pathein Township, Ayeyarwady Region |
|
|
|
|
|
|
|
|
|
|
|
|
T |
MinHla Hydropower Project |
Momentum Co., Ltd. |
Environmental and Social Impact Assessment |
|
Completed in May, 2015 |
|
- Naungcho Township, |
|
|
Northern Shan State |
|
|
|
|
|
|
|
|
T |
ESIA works on Mawlamyine |
TTW (Thai Tap Water) Public Company Limited of Thailand |
Environmental and Social Impact Assessment |
|
Completed in Jan 2016 |
|
Clean Tap Water Supply Project |
|
|
- Mawlamyine, Mon State |
|
|
|
|
|
|
|
|
T |
Manufacturing of Electrical |
Myanmar Young In Co., Ltd. |
Initial Environmental Exemination |
|
Completed in Jan 2016 |
|
Switchgear and Control Panel |
|
|
Project |
|
|
- Ngwepinlel Industrial Zone, |
|
|
Yangon Region |
|
|
|
|
|
|
|
|
T |
Soap Factory Project |
Myat Miba Company Limited, Myanmar |
|
Environmental and Social Impact Assessment |
|
Completed in May 2016 |
|
- Hlaing Township, Yangon Region |
|
|
|
|
|
|
|
|
|
T |
Danyingone Fruits, Vegetables |
Myanmar Agro Exchange Public Limited |
Environmental and Social Impact Assessment |
|
Completed in Aug, 2016 |
|
and Flowers Wholesale Market |
|
|
- Insein Township, Yangon Region |
|
|
|
|
|
|
|
|
T |
Myanmar Irrigated Command |
Mott-Macdonald, England |
Topographic Survey Work for Rehabilitation of Existing Canals and Hydraulic Structures |
|
Completed in Sep, 2016 |
|
Area Development PPTA |
|
|
- Pyawbwe & Natmauk Township, |
|
|
Magway Region |
|
|
|
|
|
|
|
|
T |
Soft Drinks Factory Project |
Asia Pacific Beverages Myanmar Company Limited |
Initial Environmental Examination |
|
Completed in Oct 2016 |
|
- Yangon Industrial Zone, |
|
|
Yangon Region |
|
Some Engineering Services Undertaken (Continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Name, Location and Description |
Client |
|
Services Undertaken |
Progress |
|
|
|
|
|
|
|
T |
Cement Plant Project |
June Cement Industry Limited |
Drainage Design and Channel Design for Water Way |
|
Completed in Nov 2016 |
|
- Kyaikmayaw Township, |
|
|
Mon State |
|
|
|
|
|
|
|
|
T |
Kalaw Resort Project Drainage |
Royal Myanmar Co.,Ltd. |
|
Kalaw Hill Resort Project Drainage System Design |
|
Completed in 2016 |
|
System |
|
|
|
- Kalaw, Shan State |
|
|
|
|
|
|
|
|
|
|
|
T |
Taunggyi Bus Terminal Project |
Golden Integrity Co., Ltd. |
Taunggyi Bus Terminal Project Drainage System Design |
|
Completed in 2016 |
|
Drainage System |
|
|
- Taunggyi, Shan State |
|
|
|
|
|
|
|
|
T |
Kalaw Hill Estate Project for Two |
Waminn Group of Companies |
Two Major Outfall Drains Design |
|
Completed in 2016 |
|
Major Outfall Drains Design |
|
|
- Kalaw, Shan State |
|
|
|
|
|
|
|
|
T |
Land Leveling, Road and Block |
Amenity Design Group |
Land Leveling, Road and Block Formation, Detail Drainage Design |
Completed in 2016 |
|
Formation, Detail Drainage |
|
Design for Happy Kit Toy in Bago |
|
Factory Industrial Zone |
|
- Bago, Bago Region |
|
|
|
|
|
|
|
|
T |
Plot No. 19, Thilawa Port Project |
New Day Energy Co., Ltd. |
Land Grading, Fencing, Gate House, Retaining Wall, Drainage Design and Quality Control |
Completed in 2016 |
|
- Kyauktan Township, Yangon Region |
|
|
|
|
|
|
|
|
|
T |
Salingon, Anyar Daw and |
Oisca of Japan |
Renovation of Existing Dam and Canal |
Completed in 2016 |
|
Kyauktagar Project |
|
- Myaing Township, Magway Region |
|
|
|
|
|
|
|
T |
Dry Port Project at YwaThaGyi |
Resources Group Logistics Co., Ltd |
|
Initial Environmental Examination |
|
Completed in 2016 |
|
- Ywathagyi, Yangon Region |
|
|
|
|
|
|
|
|
|
T |
Myitnge Dry Port Project |
KLN Singapore Ltd |
|
Initial Environmental Examination |
|
Completed in 2016 |
|
- Myitnge, Mandalay Region |
|
|
|
|
|
|
|
|
|
T |
The Construction of a modern |
Wilmar Investment Holdings, Pte. ltd., Singapore |
EIA and SIA works with RAP(Resettlement Action Plan) |
|
Completed in 2016 |
|
Multi-purpose international wharf |
|
|
and integrated agriculture |
|
|
processing facilities and |
|
|
associated utility buildings at |
|
|
Thilawa SEZ (Special Economic |
|
|
Zone), Plots 20, 21 and triangle |
|
|
area between Plots 21and 22. |
|
|
- Thilawa SEZ (Special Economic |
|
|
Zone), Yangon Region |
|
Some Engineering Services Undertaken (Continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Name, Location and Description |
Client |
|
Services Undertaken |
Progress |
|
|
|
|
|
|
|
T |
Minhla Hydropower Project |
Momentum Co., Ltd. |
Topographical, Hydrological and Geological Investigation. Dam, Weir and Spillway Detailed Design |
|
Completed in Mar, 2016 |
|
- Naungcho Township, |
|
|
Shan State |
|
|
|
|
|
T |
Mann Amara Development Project |
Mann Amara |
|
Topographic Survey Work |
|
Completed in Jun, 2016 |
|
In front of Wayyawsana Jade Pagoda |
Development Co., Ltd. |
|
|
|
|
(Myitnge, Amarapura Township) |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Myauk Oo Airport Development |
Su Htoo San |
|
Flood protction, drainage planning |
|
Completed in Oct, 2016 |
|
Project |
Construction Co., Ltd. |
|
and design for the project area which |
|
|
- Rakhine State |
|
|
is prone to flood due to the nearby |
|
|
|
|
|
|
Lemro river and the heavy rainfall |
|
|
|
|
|
|
nature. |
|
|
|
|
|
|
|
|
|
T |
Design of Land Preparation, |
Myanmar V Pile Co., Ltd |
Design of Land Preparation, Drainage Network, Urban Road System and Detail Drainage Design |
|
Completed in Nov, 2016 |
|
Drainage Network, Urban Road |
|
|
System and Detail Drainage |
|
|
Design of Secondary Central |
|
|
Business District (Mindhama) |
|
|
Project (SCBD) |
|
|
- Mayangon Township, |
|
|
Yangon Region |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Agriculture Income Improvement |
Sanyu Consultants Inc. |
Topographic Survey Work and Soil Science Investigation |
Completed in Dec, 2016 |
|
Project |
|
- Shwebo, Sagaing Region (Covering |
|
8 Townships) |
|
Thaphanseik Dam, the Largest |
|
Command Area of Myanmar |
|
|
|
|
|
|
|
T |
Mawtin Water Supply Project |
Myanmar Coffee Company Pte. Ltd. |
|
Topographical, Hydrological and Geological Investigation and Dam and Pipeline Design |
|
Completed in 2016 |
|
- Ngaputaw Township, |
|
|
|
Ayeyarwady Region |
|
|
|
|
|
|
|
|
|
T |
Flood Mitigation Study with |
Engineering Department (Road and Bridge) Yangon City Development Committee |
Proposal for Hydrological survey, analysis and Hydraulic Structures Design such as Spillway, Conduit and Garbage & Silt Filter at Kandawgyi Lake. |
|
Completed in Jan, 2017 |
|
Kandawgyi Retention Lake |
|
|
- Yangon, Yangon Region |
|
|
|
|
|
T |
Production of Road Metal |
Rock Well Mining |
|
EMP (Environmental Management |
|
Completed in Jan, 2017 |
|
(Road Pavement Rock) Project at |
Co., Ltd. |
|
Plan) for project implementation. |
|
|
Kaylartha Reserve Forest |
|
|
IEE and EMP works on Project. |
|
|
|
- Belin Township, Mon State |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Climate Friendly Agribusiness |
ADB (Asian Development Bank) |
|
Topographic Survey Work for Land (Laser Method Land Leveling) for Irrigation and Flood Protection of Ayeyarwady River |
|
Completed in Feb, 2017 |
|
Value Chain Sector Project |
|
|
|
- Pakokku Township, |
|
|
|
Mandalay Region |
|
|
|
|
|
|
|
|
|
T |
Concrete Admixture and Cement |
FOSROC Co., Ltd. |
|
EMP (Environmental Management |
|
Completed in Feb, 2017 |
|
Grinding Aids Project |
|
|
Plan) for project implementation. |
|
|
MyaSeinYaung Industrial Zone, |
|
|
|
|
|
|
- Hlaing Thayar Township, Yangon |
|
|
|
|
|
Some Engineering Services Undertaken (Continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Name, Location and Description |
Client |
|
Services Undertaken |
Progress |
|
|
|
|
|
|
|
T |
IEE with EMP for Develop a |
MYD International |
|
IEE (Initial Environmental |
|
Completed in Feb, 2017 |
|
Manufacturing, Installation and |
Co. Ltd. |
|
Examination) Works & EMP |
|
|
Marketing of Electric Control |
|
|
(Environmental Management Plan) |
|
|
|
Panel and Switch Gear Panel Project |
|
|
|
|
|
|
- Ngwe Pinle Industrial Zone, |
|
|
|
|
|
|
Hlaing Tharyar Township, Yangon |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Manufacturing of Electrical |
CMI Engineering Co., Ltd |
Initial Environmental Examination |
|
Completed in Mar, 2017 |
|
Switch Boards Sheet Metal |
|
|
Component and Steel Receiver |
|
|
Project |
|
|
- South DagonTownship, |
|
|
Yangon Region |
|
|
|
|
|
|
|
|
T |
Cavern Island Resort Project |
KMOT Co. Ltd. |
Environmental and Social Impact Assessment |
|
Completed in Apr, 2017 |
|
- Kawthoung Township, |
|
|
Tanintharyi Region |
|
|
|
|
|
|
|
|
T |
Phyu Shopping Center Project |
HI STAR Co.Ltd. |
|
EMP (Environmental Management |
|
Completed in Jun, 2017 |
|
- Phyu Township, Bago |
|
|
Plan) for project implementation. |
|
|
|
|
|
|
|
|
T |
Myanmar Engineering Council |
Sky One Construction |
|
Drainage System Design for the |
|
Completed in Jun, 2017 |
|
Office 23 Storey Building |
Co., Ltd. |
|
Project Area |
|
|
- Ahlon Township, Yangon Region |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Middle Yeywa Hydropower Plant |
Tractebel Engineering |
|
Technical Feasibilities-Phase I |
|
Completed in Jul, 2017 |
|
Project |
S.A., Company, |
|
(Geological Investigation and |
|
|
|
France |
|
Topographic Surveying) |
|
|
|
|
|
|
|
|
|
T |
Yuzana Garden City, |
Department of Rural and |
|
Drainage System Design for the |
|
Completed in Sep, 2017 |
|
Housing Compound |
Urban Development |
|
Project Area |
|
|
- Mingalardon Township, Yangon Region |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Nawa Reservoir Project |
Deputy Director's Office |
|
Impoundment of runoff water by constructing an earthen dam across the Nawa Stream to distribute water for Mong Yai down town area and nearby villages with drinking, domestic and agricultural water supply. |
|
Completed in Oct, 2017 |
|
- Mong Yai Township, |
Agriculture Livestock and |
|
|
|
Northern Shan State |
Irrigation, IWUMD |
|
|
|
|
|
Lashio, Shan State (North) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EIA works on Project. |
|
|
|
|
|
|
|
|
|
T |
Supply and Installation of 230 kV |
Myanmar Young In |
|
IEE (Initial Environmental |
|
Completed in Nov, 2017 |
|
Substation Project |
Co.Ltd. |
|
Examination) works on Project |
|
|
- Kengtong, Mine Pyine and |
|
|
|
|
|
|
Namsam Township, Eastern Shan |
|
|
|
|
|
|
State |
|
|
|
|
|
|
|
|
|
|
|
|
T |
“Sand to Agri” Project |
Golden Sunflower
|
|
Sand Dredging Activities, |
|
Completed in Feb, 2018 |
|
- Thandwe Township, Rakhine State |
Energy Co., Ltd. |
|
Thandwe River Mouth |
|
|
|
|
|
IEE and EMP works on Project. |
|
|
Some Engineering Services Undertaken (Continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Name, Location and Description |
Client |
|
Services Undertaken |
Progress |
|
|
|
|
|
|
|
T |
Kyetpahmwesaung Polder |
Welthungerhlife |
|
An Assessment on comparison of initial stage and existing stage of the Kyetpahmwesaung Polder after Nargis Cyclone affect. |
|
Completed in Mar, 2018 |
|
Management Project |
Myanmar Co., Ltd. |
|
|
|
- Pyapon Township, Ayeyarwady |
|
|
|
|
|
Region |
|
|
|
|
|
|
|
|
|
|
T |
Planning & Design for Five Main |
Engineering Department (Road and Bridge) Yangon City Development Committee |
Project Planning, Formulation, Supervision, Management and Reports Preparation, Hydrological Analysis, Drainage Design, Topographic Survey, Geological Investigation & Foundation Design, Detail Structure Design |
|
Completed in Mar, 2018 |
|
Streams Improvement and Outfall |
|
|
Structures |
|
|
|
- North Okkalapa, South Okkalapa, |
|
|
|
Mayangone, Thingangyun and Yankin |
|
|
|
|
|
Townships, Yangon Region |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T |
Kanni and Myinkun Pump Irrigation |
Irrigation and Water |
|
Detailed design of irrigation and |
|
Completed in Mar, 2018 |
|
Project |
Utilization Management |
|
drainage, canal network including |
|
|
(Magwe and Minbu Townships) |
Department (IWUMD) |
|
necessary structures. (Kanni Pump |
|
|
|
|
|
|
Irrigation Project in Minbu Township |
|
|
|
|
|
|
has a command area of 590 acres |
|
|
|
|
|
|
(239 ha). Myinkun Project in Magwe |
|
|
|
|
|
|
Township has a command area of |
|
|
|
|
|
|
550 acres (233 ha). |
|
|
|
|
|
|
|
|
|
T |
Ba Nya Dala Affordable Housing |
Department of Rural and |
|
Drainage and Pipe Line System |
|
Completed in Apr, 2018 |
|
Project |
Urban Development |
|
Design for the Project Area of 4 Unit |
|
|
- Mawlamyine Township, Mon State |
|
|
4 Storey Affordable Housing 16 Nos. |
|
|
|
|
|
|
in 19.2 acre of Area. |
|
|
|
|
|
|
|
|
|
T |
Yangon Museum Development |
Fujita Inoue Corporation |
|
Drainage System Design |
|
Completed in May, 2018 |
|
Project |
Yangon Branch |
|
|
|
|
- Shwedagon Pagoda Road, |
|
|
|
|
|
|
Dagon Township, Yangon Region |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Planning & Design for Thamine |
Engineering Department (Road and Bridge) Yangon City Development Committee |
Topographic Survey, Geological Investigation & Foundation Design, Detail Structure Design, Project Planning, Formulation, Supervision, Management and Reports Preparation and Hydrological Analysis |
|
Completed in Jul, 2018 |
|
Stream Improvement and |
|
|
Outfall Structures |
|
|
|
- Mayangone, Hlaing and Insein |
|
|
|
Townships, Yangon Region |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T |
Planning & Design for Kamaryut |
Engineering Department (Road and Bridge) Yangon City Development Committee |
Topographic Survey, Geological Investigation & Foundation Design, Detail Structure Design, Project Planning, Formulation, Supervision, Management and Reports Preparation and Hydrological Analysis |
|
Completed in Aug, 2018 |
|
Stream Improvement and |
|
|
Outfall Structures |
|
|
|
- Kamaryut and HlaingTownships |
|
|
|
Yangon Region |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
T |
Drainage System Design for 4 |
Yangon City |
|
Drainage system design for four |
|
Completed in Aug, 2018 |
|
Townships in Yangon |
Development Committee |
|
townships in Yangon. |
|
|
(Tamwe, Bahan, South Okkalapa, |
|
|
|
|
|
|
South Dagon Townships) |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Shwe Gon Landmark Mixed-use |
Shwe Gon Development |
|
Survey and Analysis of Drainage |
|
Completed in Oct, 2018 |
|
Development Project (Yangon) |
Group Co., Ltd. |
|
System Design |
|
|
|
|
|
|
|
|
T |
Shwe Gon Landmark Mixed-use |
Shwe Gon Development |
|
Survey and Analysis of Drainage |
|
Completed in Oct, 2018 |
|
Development Project (Yangon) |
Group Co., Ltd. |
|
System Design |
|
|
|
|
|
|
|
|
T |
Mya Khwar Nyo Apartment Project |
Yangon Golden River |
|
Environmental and Social Impact Assessment |
|
Completed in Oct, 2018 |
|
Plot No. 61, 62 up to 71, 78 |
Investment Co. Ltd. |
|
|
|
- Thaketa Township, Yangon Region |
|
|
|
|
|
Some Engineering Services Undertaken (Continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Name, Location and Description |
Client |
|
Services Undertaken |
Progress |
|
|
|
|
|
|
|
T |
Pan Hlaing Sluice Project |
Haskoning DHV Myanmar |
|
Assessment of historical background |
|
Completed in Dec, 2018 |
|
|
|
|
of river system development Pan |
|
|
|
|
|
Hlaing over the last 50 years. Data |
|
|
|
|
|
|
collection for land use, irrigation water |
|
|
|
|
|
|
demand, operation methods of current |
|
|
|
|
|
|
irrigation system, waste water |
|
|
|
|
|
|
discharges, the layout of the current |
|
|
|
|
|
|
irrigation and drainage system, |
|
|
|
|
|
|
historical floods and areal elevations. |
|
|
|
|
|
|
Providing support in the definition of |
|
|
|
|
|
|
the system and sluice design criteria |
|
|
|
|
|
|
and contribute to general findings and |
|
|
|
|
|
|
recommendations. Contribute to capacity |
|
|
|
|
|
|
building and knowledge transfer to selected |
|
|
|
|
|
|
staff from Irrigation and Water Utilization |
|
|
|
|
|
|
Management Department. |
|
|
|
|
|
|
|
|
|
T |
Chemical Tank Terminal Project |
Thuriya Energy Deport |
|
Environmental and Social Impact Assessment |
|
Completed in Jan, 2019 |
|
- Thanlyin Township, Yangon Region |
Management Co. Ltd. |
|
|
|
|
|
|
|
|
|
T |
Dry Ports Project |
Resources Group |
|
Initial Environmental Examination |
|
Completed in Jan, 2019 |
|
- Ywathagyi Township, Yangon |
Logistics Co. Ltd. |
|
|
|
|
|
|
|
|
|
T |
Dry Ports Project |
Resources Group |
|
Initial Environmental Examination |
|
Completed in Jan, 2019 |
|
- Myitnge Township, Mandalay |
Logistics Co. Ltd. |
|
|
|
|
|
|
|
|
|
T |
Circuit Breaker Assembling Project |
Winner Power |
|
Initial Environmental Examination and Environmental Management Plan |
|
Completed in Jan, 2019 |
|
- North Dagon Township, Yangon |
International Co. Ltd. |
|
|
|
|
|
|
|
|
T |
Pintaya Estate Development |
Forever Co., Ltd. |
|
- Execution of water source |
|
Completed in Feb, 2019 |
|
Project |
|
|
investigation, geological investigation |
|
|
(Shan State) |
|
|
and design works for tank no. (N-7) |
|
|
|
|
|
|
- Investigation work of water supply |
|
Completed in Nov, 2018 |
|
|
|
|
for plantation |
|
|
|
|
|
- Topographic survey work of |
|
Completed in June, 2019 |
|
|
|
|
4 ponds, renovation design for |
|
|
|
|
|
Thayetpya Pond |
|
|
|
|
|
|
|
|
|
T |
Coal Mine Production Project |
Myanmar Kaungtong |
|
Environmental and Social Impact Assessment |
|
Completed in Mar, 2019 |
|
- Mawlaik Township, Sagaing Region |
Industrial Co. Ltd. |
|
|
|
|
|
|
|
|
|
T |
Pyawt Ywa Pump Irrigation |
Irrigation and Water |
|
Improving scheme operations and |
|
Completed in Mar, 2019 |
|
Project (Rehabilitation) |
Utilization Management |
|
management to ensure stronger |
|
|
- Myinmu Township, Sagaing Region |
Department |
|
community involvement (in associate |
|
|
|
|
|
|
with IWMI, Lead Consultant) |
|
|
|
|
|
|
|
|
|
T |
Development of the Ayeyarwady |
Directorate of Water |
|
Decision support system, river basin |
|
Completed in Mar, 2019 |
|
Decision Support System and |
Resources and |
|
management, capacity building, |
|
|
Basin Master Plan |
Improvement of River |
|
stakeholder management and database |
|
|
|
|
System (DWIR) |
|
management in associate with Arcadis, |
|
|
|
|
|
|
Lead Consultant, Netherland. |
|
|
Some Engineering Services Undertaken (Continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Name, Location and Description |
Client |
|
Services Undertaken |
Progress |
|
|
|
|
|
|
|
T |
Kuaukse Gas Combined Cycle |
Nippon Koei Co., Ltd. |
|
Execution of data collection of |
|
Completed in Mar, 2019 |
|
Power Plant Construction Project |
|
|
weather conditions and natural |
|
|
(Preparatory Survey) |
|
|
disaster. |
|
|
|
(KyaukseTownship, |
|
|
|
|
|
|
Mandalay Region) |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Myanmar World Trade Center |
Datong Holding Co., Ltd. |
|
Initial Environmental Examination and Environmental Management Plan |
|
Completed in Apr, 2019 |
|
Project |
|
|
|
|
(Adjacent to No. 3 Highway (Yangon- |
|
|
|
|
|
Mandalay), Plot No. 1-143, |
|
|
|
|
|
|
- Mingalardon City, Yangon |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Soft Drink Factory Project |
Asia Pacific Beverages |
|
Initial Environmental Examination |
|
Completed in Apr, 2019 |
|
Yangon Industrial Park |
Myanmar Co. Ltd. |
|
|
|
- Mingalardon Township, Yangon |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Vocational Training Institute |
Yamashita Sekkei Inc. |
|
Drainage system design work for |
|
Completed in Apr, 2019 |
|
(Aung San) Project |
Tokyo, Japan |
|
project area. |
|
|
Insein Township, Yangon Region |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Aung Chan Thar Creek Drainage |
Yangon City |
|
Drainage system design work for |
|
Completed in May, 2019 |
|
Bahan, Sanchaung, Kyimyindine |
Development Committee |
|
project area. |
|
|
Townships, Yangon Region |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Yuzana Edible Oils Group |
Yuzana Co., Ltd. |
|
Drainage system design work for |
|
Completed in May, 2019 |
|
|
|
|
project area. |
|
|
|
|
|
|
|
|
T |
Sayarsan Project (2 Basement and |
Yuzana Co., Ltd. |
|
Drainage system design work for |
|
Completed in May, 2019 |
|
24 Storey Building) |
|
|
project area. |
|
|
Tamwe Township, Yangon Region |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Integrated Ayeyarwady Delta |
Arcadis Nederland B.V |
|
Seconded to Arcadis to work as |
|
Completed in Aug, 2019 |
|
Strategy Bank and Bed Protection |
Netherlands |
|
Junior River and Coastal Engineer |
|
|
Ayeyarwady River at Nyaungdon |
|
|
and to a Junior Ports and Waterways |
|
|
|
Rapid Multi-Hazard Risk Assessment |
|
|
Expert at the IADS project office. |
|
|
|
of the Yangon Region Water Supply |
|
|
Supporting function for Bank and |
|
|
|
Network and Infrastructure Systems |
|
|
Bed Protection Ayeyarwady River at |
|
|
|
|
|
|
Nyaungdone Project and other water |
|
|
|
|
|
|
management projects. |
|
|
|
|
|
|
|
|
|
T |
Aqua Feed Mill Factory |
Aqua Feed Mill |
|
Environmental and Social Impact Assessment |
|
Completed in Aug, 2019 |
|
Myaungdagar Industrial Zone |
Factory |
|
|
|
- Hmawbi Township, Yangon |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Irrigation Development Project in |
Sanyu Consultants Inc. |
|
Detailed design of irrigation and |
|
Completed in Sep, 2019 |
|
West Bago Region |
(SCI), Japan |
|
drainage, canal network including |
|
|
(North Nawin, South Nawin, Taung |
|
|
necessary structures. |
|
|
|
Nyo, Wegyi (4) Dams in Tharyarwady |
|
|
|
|
|
|
Township, Pyay District) |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Improvement of Outlet Main Drain |
Yuzana Edible Oils Group |
|
Geological survey, topographic |
|
Completed in Feb, 2020 |
|
in front of Yuzana Edible Oils Group |
Limited |
|
survey and detail drainage |
|
|
and Five Star Corporation |
|
|
system design |
|
|
|
Thaketa Township, Yangon |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Saw Mahar Project |
Sae Paing Development |
|
Topographic survey and detail |
|
Completed in Mar, 2020 |
|
No. 6, Bo Cho (2) Quarter, Saw Mahar |
Limited |
|
drainage system design |
|
|
Street, Bahan Township, Yangon |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Yangon-Mandalay Express Way |
DASAN, Korea |
- |
Topographic Survey for 13 major |
|
Completed in May, 2020 |
|
Project |
(Funded by QUICA) |
|
bridges along the express way. |
|
|
|
|
- |
Hydrological Analysis for road |
|
|
|
|
|
|
crossing river and creeks |
|
|
Some Engineering Services Undertaken (Continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Name, Location and Description |
Client |
|
Services Undertaken |
Progress |
|
|
|
|
|
|
|
T |
Yangon-Nga Yoke Kaung (Rakhaine) |
DASAN, Korea |
- |
Topographic Survey for river |
|
Completed in Jun, 2020 |
|
High Way Project (New Alignment) |
(Funded by QUICA) |
|
banks of Toe, Ayeyarwady, |
|
|
|
|
|
Panmawady and Ngawon Rivers |
|
|
|
|
|
|
at the road. |
|
|
|
|
|
- |
Hydrological Analysis for 4 Rivers |
|
|
|
|
|
- |
Information of Navigation for 4 Rivers |
|
|
|
|
|
|
|
|
|
T |
Agriculture Income Improvement |
Sanyu Consultants Inc. |
- |
Topographic Survey for targeted |
|
Completed in Oct, 2020 |
|
Project (AIIP-Phase 2) |
(SCI), Japan |
|
bridge |
|
|
Ayeyarwady Delta Region |
(Funded by JICA) |
- |
Geological Investigation for 3 |
|
|
|
|
|
|
bridges, used diamond core drill. |
|
|
|
|
|
- |
Geological Investigation for |
|
|
|
|
|
|
Road & Polar Dikes |
|
|
|
|
|
|
|
|
|
T |
Public Development Project |
Shwe Su Pan Co., Ltd. |
|
Topographic survey and detail |
|
Completed in Oct, 2020 |
|
Waibargi Road, North Okkalapa |
|
|
drainage system design |
|
|
Township, Yangon Region |
|
|
|
|
|
|
|
|
|
|
|
|
T |
Agriculture Income Improvement |
Sanyu Consultants Inc. |
- |
Topographic Survey for targeted |
|
Completed in Oct, 2020 |
|
Project (AIIP-Phase 2) |
(SCI), Japan |
|
bridge |
|
|
Ayeyarwady Delta Region |
(Funded by JICA) |
- |
Geological Investigation for 3 |
|
|
|
|
|
|
bridges, used diamond core drill. |
|
|
|
|
|
- |
Geological Investigation for |
|
|
|
|
|
|
Road & Polar Dikes |
|
|
|
|
|
|
|
|
|
T |
Irrigation System Modernization Unit |
KRC, Korea |
Chaung Magyi Irrigable area of |
|
|
On going |
|
(ISMU - 2) |
(Funded by ADB) |
(7000 Acre) in Central Dry Zone. |
|
|
|
|
|
|
- |
Detailed Design of all canals and |
|
|
|
|
|
|
hydraulic structures. |
|
|
|
|
|
- |
Construction supervision |
|
|
|
|
|
|
|
|
|
T |
City Loft West Project |
Development Limited |
- |
Produced bathymetric survey map |
|
Completed |
|
(New Estate Construction) |
FMI River Side |
|
for flood analysis at Hlaing River. |
|
|
|
Yangon Region |
|
- |
Produced topographic map for |
|
|
|
|
|
|
catchment area determination, |
|
|
|
|
|
|
using Arial Photogrammetry data |
|
|
|
|
|
- |
Geological Investigation for Bank |
|
|
|
|
|
|
Protection |
|
|
|
|
|
- |
Produced flood hazard map and |
|
|
|
|
|
|
flood risk map. |
|
|
|
|
|
- |
Planning flood mitigation and |
|
|
|
|
|
|
damage value. |
|
|
|
|
|
- |
Detail design of retaining wall and |
|
|
|
|
|
|
revetment |
|
|
|
|
|
|
|
|
|
T |
Flood Mitigation Project |
Myanmar Koei |
|
Data Collection Survey on |
|
Completed |
|
(Yangon City) |
(Funded by JICA) |
|
Yangon Drainage (Aung Chan |
|
|
|
Yangon Region |
|
|
Thar Creek, a major outlet drain |
|
|
|
|
|
|
covering 3 townships) |
|
|
|
|
|
|
(Topography, Geology, Hydrology |
|
|
|
|
|
|
and Hydraulic Structure Analysis) |
|
|
Some Engineering Services Undertaken (Continued) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Name, Location and Description |
Client |
|
Services Undertaken |
Progress |
|
|
|
|
|
|
|
T |
Yangon City Flood Mitigation Project |
Yangon City |
Drainage System Design Work |
|
|
Completed |
|
(Downtown 8 Sub. Urban Area) |
Development Committee |
- |
Detail survey work of existing |
|
|
|
Yangon Region |
(YCDC) & Department of |
|
drains and relevant structures |
|
|
|
|
Urban & Housing |
- |
Geological investigation for structures |
|
|
|
|
Development (DUHD) |
- |
Hydrological analysis |
|
|
|
|
(Funded by Government) |
- |
Hydraulic analysis |
|
|
|
|
|
- |
Detail design of drainage and |
|
|
|
|
|
|
structures including culverts and |
|
|
|
|
|
|
structures including culverts and |
|
|
|
|
|
|
(Using HEC-HMS, HEC-RAC, |
|
|
|
|
|
|
SWAMM mode softwares) |
|
|
|
|
|
|
|
|
|
T |
Ahlone Development Project |
Green Urban Ventures |
|
Topographic Survey and Analysis |
|
Completed |
|
Ahlone Township, Yangon Region |
Co., Ltd. |
|
of Drainage System Design |
|
|
|
|
|
|
|
|
|
T |
Tank Firm & Jetty Project |
Apex Union Gas |
|
Environmental and Social Impact Assessment |
|
Completed |
|
- Thanlyin Township, Yangon |
Co., Ltd. |
|
|
|
|
|
|
|
|
|
|
T |
Tank Firm & Jetty Project |
IGE Services Co., Ltd. |
|
Environmental and Social Impact Assessment |
|
Completed |
|
- Thanlyin Township, Yangon |
|
|
|
|
|
|
|
|
|
|
|
T |
Tank Firm & Jetty Project |
KMA SIAM Limited |
|
Environmental and Social Impact Assessment |
|
Completed |
|
- Thanlyin Township, Yangon |
(KSL) |
|
|
|
|
|
|
|
|
|
|
T |
Public Rental Housing Project |
Myanmar Construction |
Drainage System Design Work |
|
|
Completed |
|
South Dagon Township, |
Entreprenier Fedration |
- |
Detail survey work of existing |
|
|
|
Yangon Region |
(MCEF) |
|
drains and relevant structures |
|
|
|
|
|
- |
Geological investigation for structures |
|
|
|
|
|
- |
Hydrological analysis |
|
|
|
|
|
- |
Hydraulic analysis |
|
|
|
|
|
- |
Detail design of drainage and |
|
|
|
|
|
|
structures including culverts and |
|
|
|
|
|
|
structures including culverts and |
|
|
|
|
|
|
(Using HEC-HMS, HEC-RAC, |
|
|
|
|
|
|
SWAMM mode softwares) |
|
|
|
|
|
|
|
|
|
T |
AVA Housing Development Project |
Department of Housing |
Drainage System Design Work |
|
|
Completed |
|
South Dagon Township, |
and Urban Development |
- |
Detail survey work of existing |
|
|
|
Yangon Region |
(DHUD) |
|
drains and relevant structures |
|
|
|
|
|
- |
Geological investigation for structures |
|
|
|
|
|
- |
Hydrological analysis |
|
|
|
|
|
- |
Hydraulic analysis |
|
|
|
|
|
- |
Detail design of drainage and |
|
|
|
|
|
|
structures including culverts and |
|
|
|
|
|
|
structures including culverts and |
|
|
|
|
|
|
(Using HEC-HMS, HEC-RAC, |
|
|
|
|
|
|
SWAMM mode softwares) |
|
|