Project Name & Description |
Services Undertaken |
Location |
Client |
Progress |
Project Name |
Work Load |
State & Division |
Township |
Year |
Status |
Baluchaung No.(3)
Hydroelectric Power Project
- Loikaw T.S, Kayah State
A cascade Hydropower
development providing 334 GWh/year
|
334 GWh/year |
Hydraulic model study of Ht Intake
in cooperation with Irrigation
Technology Centre
|
Kayah |
Loikaw |
High Tech Concrete
Technology Co., Ltd
|
2010
|
PD |
Nacho Hydropower Project
- Mandalay Division
A storage type hydropower scheme
including concrete gravity dam
|
|
Hydraulic model study of spillway
in coopertion with Irrigation
Technology Centre
|
Mandalay |
|
Department of Hydro-
power Implementation
No.(1) Ministry of
Electric Power
|
May 2010 |
PD |
Upper Paung Laung Hydropower
Project
A storage type hydropower scheme
involving a roller compacted
concrete dam
|
|
Hydraulic model study for bottom
outlet and spillway of the project.
|
ITC, ID |
Bago |
Department of Hydro-
power Implementation
No.(1) Ministry of
Electric Power
|
Aug 2009
|
PD |
Upper Paung Laung Hydropower
Project
A storage type hydropower scheme
involving a roller compacted
concrete dam
|
|
Local counterpart for engineering
and AutoCAD Services
|
ITC, ID |
Bago |
AF-Colenco Ltd.
Switzerland
|
Ongoing
|
PD |
Loka Chan Tha Bridge |
100ft span/15ft width with
60 ft bored pile foundation |
Design and construction of R.C.C
bridge including 60 ft deep bored
pile foundation work.
|
Ayeyarwady |
Pyinywa, Myaungmya |
Ashin Eindaka, USA |
2003 |
PD,IC |
Wind generator Project, Installation of wind Generator of
500 KVA capacity.
|
500 kW |
Design and construction
supervision for wind generator
foundation.
|
Ayeyarwady |
Ngwe Saung, Pathein |
Thiri Lwin Co.
|
2006 |
PD , QC |
200 Ton per day Pulp Mill
Project, Construction of pulp mill; design
and quality assurance by China
Metallurgical Construction (Group)
Corporation (MCC)
|
200 ton per day |
Construction works mainly in Area
5 of the Project which includes
water intake pump station, supply
water purification station and
effluent treatment plant. The
works involve about 22000 cu-m
of reinforced concrete mostly of
water tight structures. Also
undertook installation of intake
pipe line from river, some
mechanical and electrical
installation works, construction of
pipe support bridge, pontoon
bridge, drainage network and
some insulation works.
|
Ayeyarwady |
Thabaung |
Ministry of Industry No.
(1) |
2005 |
PD, IC |
Nyaungbininn Hydropwer
|
3kW x 2 nos. |
Nyaungbinin power scheme |
Bago |
Paukkhaung |
Nyaungninni Village |
2008 |
P |
Nyaungbininn Hydropwer |
3 KW x 2 nos. |
Nyaungbinin hydropower
|
Bago |
Paukkhaung |
Nyaungninni Village |
2008 |
P |
Namtalon Micro-Hydropower
Project |
26 kV x 4 nos. |
Nan-talon mini hydropower
|
Sagaing |
Homalin |
Nanpaung Power Supply Co.,
Ltd. |
2009 |
P |
Provision of
Micro-Hydropower Facility |
5 kW x 8 nos. |
Airbase mini hydropower
|
Sagaing
|
Homalin |
Homalin Airbase |
2009 |
P |
Nyaungbininn Hydropwer |
3 kW x 2 nos.
|
Nyaungbininn hydropower |
Bago
|
Paukkhaung
|
Nyaungbininn Village |
2008 |
P |
Kun Hydropower Project
|
50 MW, 200 ft |
Kun hydropower project,
rock-filled dam |
Bago |
Phyu |
Myanma Electric Power
Enterprise |
2003 |
PD |
Nampaung Mini-Hydropower
Projcet |
300 kW x 3 nos. |
Nanpang hydropower |
Northern Shan |
Tanyan
|
Tanyan Power Supply Co.
|
2009 |
P |
Namtalon Micro-Hydropower
Project |
26 kW x 4 nos. |
Nan-talon hydropower |
Sagaing
|
Homalin
|
Nanpuaung Power Supply Co. |
2009 |
P |
Shwe Taung Pump Irrigation
scheme |
500 ac |
Land consolidation for
modern farming irrigation and drainage
facilities |
Yangon |
Dagon |
Shwetaung Development Co.
Ltd. |
2009 |
P |
Foundation Soil
Investigation of Storm Shelter |
|
Soil survey for storm
shelter |
Ayeyarwady
|
Labutta |
Basic Education Department |
2009 |
P |
Latpan Pump Irrigation Project
|
|
Topographic survey and design of
pump irrigation system
|
Yangon Division
|
Hlegu |
WRUD MOAI |
Aug, 2012
|
P |
Meiktila Plain |
40000 ac |
Remodelling of irrigation |
Mandalay
|
Wundwin |
WRUD |
2011 |
P |
Pumping Project |
|
and drainage system |
|
|
|
|
|
Shwehlanbo Region Greening
Project |
5000 ac |
Remodelling of irrigation
and drainage system |
Mandalay
|
Sinkkaing |
WRUD
|
2011 |
P |
Lapan Pump Irrigation
Project |
8000 ac |
Remodelling of irrigation
and drainage system |
Yangon
|
Hlegu |
WRUD
|
2011 |
P |
Yebudalin Pump Irrigation
Project |
40000 ac |
Remodelling of irrigation
and drainage system |
Sagaing
|
Budalin |
WRUD
|
2011 |
P |
Pataw Reservoir Clean
Water Project |
200000 gals/day |
Sedimentation pond and
appurtenance structures |
Taninthayi
|
Myeik
|
Pyiphyo Tun Co., Ltd.
|
2011 |
P |
Tonkan Hydropower Project |
60 kw |
Power house and
appurtenance structure |
Bago
|
Phyu |
Sai Pyi Sone & Parter
|
2010 |
P |
Land consolidaton |
500 ac |
Land consolidation for
modern farming for pump irrigation network |
Yangon
|
Dagon |
Shwetaung Development Co.
Ltd. |
2009 |
P |
Nampaung Mini-Hydropower
Projcet |
300 kW x 3 nos. |
Nan-pan hydropower |
Shan |
|
Tangyan Power Supply Co.,
Ltd.
|
2009 |
P |
Namtalon Micro-Hydropower
Project |
26 kW x 4 nos. |
Nan-talon hydropower
|
Sagaing |
Homalin |
Nanpaung Power Supply Co.,
Ltd. |
2009 |
P |
Provision of
Micro-Hydropower Facility |
5 kW x 8 nos. |
Airbase hydropower |
Sagaing |
Homalin |
Homalin Airbase |
2009 |
P |
Nyaungbininn Hydropwer |
3kW x 2 nos. |
Nyaungbinin hydropower
|
Bago |
Paukkhaung |
Nyaungninni Village |
2008 |
P |
Wind Generator Project, Installation of wind Generator of
500 KVA capacity.
|
500 kVA capicity |
Design and construction
supervision for wind generator
foundation.
|
Ayeyarwady |
Ngwe Saung Beach, Pathein
|
Thiri Lwin Co., Ltd. |
2006 |
PD , QC |
Kun Hydropower Project Storage type hydropower scheme
of installed capacity 60 MW
involving a 200 ft high rock fill dam.
|
200 ft height |
Feasibility Study and Detailed
Design.
|
Bago |
Phyu |
Myanma Electric Power
Enterprise |
2003 |
PD |
Loka Chan Tha Bridge |
100ft span/15ft width with
60 ft bored pile foundation |
Design and construction of R.C.C
bridge including 60 ft deep bored
pile foundation work.
|
Ayeyarwady |
Pyinywa, Myaungmya |
Ashin Eindaka, USA |
2003 |
PD,IC |
Leprosy Control and Basic Health
Services Project
Construction of training centre,
dormitory and special skin clinic.
|
|
Review of Design and Quality Assurance.
|
Mandalay |
Mandalay |
JICA |
2001 |
PD |
Tebokan Agricultural
Development Project Construction of an earth dam of
45000 cu-yd for impounding of
water for agricultural use
|
45000 cuyd. |
Investigation, Design and
Construction Quality Control.
|
|
Tebokan, Salin |
Asia World Co., Lrd. |
1999 |
P |