Project Name & Description |
Services Undertaken |
Location |
Client |
Progress |
Project Name |
Work Load |
State & Division |
Township |
Year |
Status |
|
|
Dams |
|
|
|
|
|
|
|
Spillway |
|
|
|
|
|
|
|
Conduits |
|
|
|
|
|
|
|
Hydraulic model study |
|
|
|
|
|
|
|
Irrigation canals |
|
|
|
|
|
|
|
Drainage canals |
|
|
|
|
|
Water Supply Project , Mongshu Gem land
Water supply of 30000 gph for a
net head of 850 ft by multi-stage
pumps.
|
80000 gph |
Investigation, Design and
Construction Supervision
|
Shan |
Mongshu |
Shan Yoma |
1999 |
C |
Seik Nyan Pump Irrigation Project
|
|
Design of Flood Protection &
Drainage Works Planning and
Design Works for Water
Extraction
|
Mandalay Region |
|
Water Resources Utilization Dept. |
2013 |
C |
Saw Chaung Hydropower Project
- Kanpetlet Township
Run-of the river type hydropower
scheme generating 2 MW.
|
2 MW |
Topographical, Hydrological
and Geological Investigation
Feasibility Design
|
Chin State |
Kanpetlet Township
|
Myat Noe Thu
Construction Co., Ltd.
|
2014 |
C |
Rubber Factory Project
|
|
Initial Environmental Examination
|
Mon State |
Belin |
Max Myanmar Co., Ltd |
2014 |
C |
Mandalay Myotha Industrial
Development Project
|
2 MW |
"Design of Land Preparation,
Road Formation and Storm Water Drainage Design for Causeway,
Culverts and Road Side Drain on Port Link Road,
Design of Dam and Water body for Initial Phase, Area,
Design for general Cargo Yard and Ramp on Semeikkon Port"
|
Mandalay Region |
Myingyan Township
|
Mandalay Myotha Industrial Development Public Company Limited
|
Aug, 2014 |
C |
Shoe Factory Project
|
|
Initial Environmental Examination
|
Yangon Region |
Hlainhtharyar Township, |
Tian Yu International Co., Ltd |
2014 |
C |
Okkan Sugar Factory Project
|
|
Environmental and Social Impact Assessment
|
Yangon Region |
Taikkyi
|
Golden Myan-Tai Co.,Ltd
|
July, 2015 |
C |
Flood Mitigation of Yangon City Downtown Area
|
|
- Topographic Survey Work for
existing roads and drains of 6
township of Yangon City
- Preliminary Design of Storm
Water Drains and other related
Structures
|
Yangon Region |
- Puzuntaung , Botahtaung ,
Kyauktada, Pabetan, Latha and
Lamadaw Township
|
Yangon City Development Committee |
2015 |
C |
Drainage Assessment for HAGL Myanmar Plaza Development
|
|
Design of Storm Water Drains and other related Structures
|
Yangon Region |
Yankin Township
|
HAGL Co., Ltd
|
2015 |
C |
Twingyi Pump Irrigation Project
|
|
Topographic Survey and Design of Pump Irrigation System
|
|
|
WRUD, MOAI |
2015 |
C |
Cement Plant Project
|
|
Drainage Design and Channel Design for Water Way
|
Mon State |
Kyaikmayaw Township
|
June Cement Industry Limited
|
Nov 2016 |
C |
Kalaw Resort Project Drainage System
|
|
Kalaw Hill Resort Project Drainage System Design
|
Shan State
|
Kalaw
|
Royal Myanmar Co.,Ltd. |
2016 |
C |
Taunggyi Bus Terminal Project Drainage System
|
|
Taunggyi Bus Terminal Project Drainage System Design
|
Shan State |
Taunggyi
|
Golden Integrity Co., Ltd.
|
2016 |
C |
Kalaw Hill Estate Project for Two Major Outfall Drains Design
|
|
Two Major Outfall Drains Design
|
Shan State
|
Kalaw
|
Waminn Group of Companies |
2016 |
C |
Land Leveling, Road and Block Formation, Detail Drainage Design for Happy Kit Toy in Bago Factory Industrial Zone
|
|
Land Leveling, Road and Block Formation, Detail Drainage Design
|
Bago Region |
Bago
|
Amenity Design Group
|
2016 |
C |
Plot No. 19, Thilawa Port Project
|
|
Land Grading, Fencing, Gate House, Retaining Wall, Drainage Design and Quality Control
|
Yangon Region
|
Kyauktan Township
|
New Day Energy Co., Ltd. |
2016 |
C |
Design of Land Preparation, Drainage Network, Urban Road System and Detail Drainage
Design of Secondary Central Business District (Mindhama) Project (SCBD)
|
|
Design of Land Preparation, Drainage Network, Urban Road System and Detail Drainage Design
|
Yangon Region |
Mayangon Township
|
Myanmar V Pile Co., Ltd
|
Nov 2016 |
C |
Flood Mitigation Study with Kandawgyi Retention Lake
|
|
Proposal for Hydrological survey, analysis and Hydraulic Structures Design such as Spillway, Conduit and Garbage & Silt Filter at Kandawgyi Lake.
|
Yangon Region
|
Yangon
|
Engineering Department (Road and Bridge) Yangon City Development Committee |
Jan 2017 |
C |
Minhla Hydropower Project
|
|
Topographical, Hydrological and Geological Investigation. Dam, Weir and Spillway Detailed Design
|
Shan State |
Naungcho Township
|
Momentum Co., Ltd.
|
Mar 2016 |
C |
Myanmar Engineering Council Office 23 Storey Building
|
|
Drainage System Design for the Project Area
|
Yangon Region |
Ahlon Township
|
Sky One Construction Co., Ltd. |
Jun 2017 |
C |
Yuzana Garden City, Housing Compound
|
|
Drainage System Design for the Project Area
|
Yangon Region |
Mingalardon Township
|
Department of Rural and Urban Development
|
Sept 2017 |
C |
Ba Nya Dala Affordable Housing Project
|
|
Drainage and Pipe Line System Design for the Project Area of 4 Unit 4 Storey Affordable Housing 16 Nos.in 19.2 acre of Area.
|
Mon State |
Mawlamyine Township
|
Department of Rural and Urban Development |
Apr 2018 |
C |
Yangon Museum Development Project , Shwedagon Pagoda Road
|
|
Drainage System Design
|
Yangon Region |
Dagon Township
|
Fujita Inoue Corporation Yangon Branch
|
May 2018 |
C |
Planning & Design for Thamine Stream Improvement and Outfall Structures
|
|
Topographic Survey, Geological Investigation & Foundation Design, Detail Structure Design, Project Planning, Formulation, Supervision, Management and Reports Preparation and Hydrological Analysis
|
Yangon Region |
Mayangone, Hlaing and Insein Township |
Engineering Department (Road and Bridge) Yangon City Development Committee |
Jul 2018 |
C |
Planning & Design for Thamine Stream Improvement and Outfall Structures
|
|
Topographic Survey, Geological Investigation & Foundation Design, Detail Structure Design, Project Planning, Formulation, Supervision, Management and Reports Preparation and Hydrological Analysis
|
Yangon Region |
Kamaryut and HlaingTownships
|
Engineering Department (Road and Bridge) Yangon City Development Committee
|
Aug 2018 |
C |
Drainage System Design for Four Townships in Yangon
|
|
Drainage system design for four townships in Yangon.
|
Yangon Region |
Tamwe, Bahan, South Okkalapa,South Dagon Townships |
Yangon City Development Committee |
Aug 2018 |
C |
Vocational Training Institute (Aung San) Project
|
|
Drainage system design work for project area.
|
Yangon Region |
Insein Township
|
Yamashita Sekkei Inc.Tokyo, Japan
|
Apr 2019 |
C |
Aung Chan Thar Creek Drainage
|
|
Drainage system design for four townships in Yangon.
|
Yangon Region |
Bahan, Sanchaung, Kyimyindine Townships |
Yangon City Development Committee |
May 2019 |
C |
Yuzana Edible Oils Group
|
|
Drainage system design work for project area.
|
|
|
Yuzana Co., Ltd.
|
May 2019 |
C |
Sayarsan Project (2 Basement and 24 Storey Building)
|
|
Drainage system design for four townships in Yangon.
|
Yangon Region |
Tamwe Township |
Yuzana Co., Ltd. |
May 2019 |
C |
Irrigation Development Project in West Bago Region (North Nawin, South Nawin, Taung
Nyo, Wegyi (4) Dams in Tharyarwady Township, Pyay District)
|
|
Detailed design of irrigation and drainage, canal network including necessary structures.
|
Bago Region |
Tharyarwady Township
|
Sanyu Consultants Inc.(SCI), Japan
|
Sep 2019 |
C |
Kanni and Myinkun Pump Irrigation Project
|
|
Detailed design of irrigation and drainage, canal network including necessary structures. (Kanni Pump
Irrigation Project in Minbu Township has a command area of 590 acres (239 ha). Myinkun Project in Magwe Township has a command area of 550 acres (233 ha).
|
Magwe District |
Minbu Township |
Irrigation and Water Utilization Management Department (IWUMD) |
Mar 2018 |
C |
Planning & Design for Five Main Streams Improvement and Outfall Structures
|
|
Project Planning, Formulation, Supervision, Management and Reports Preparation,
Hydrological Analysis, Drainage Design, Topographic Survey, Geological Investigation & Foundation Design, Detail Structure Design
|
Ynagon Region |
North Okkalapa, South Okkalapa, Mayangone, Thingangyun and Yankin
|
Engineering Department (Road and Bridge) Yangon City Development Committee
|
Mar 2018 |
C |
Water Supply for Suger
Mill |
10 million gpd |
Design and construction works for water supply of eight sugar mills each having an average demand of 10 million gallon per day. |
Central Myanmar |
|
Water Resources Utilization Dept. MOAI |
1999 |
C |
Garment Factory A garment factory for 300 sewing machines
including canteen and office. |
300 sewing |
Detailed Design and Construction
|
Yangon
|
Hlaingtharyar |
Myanmar Gustan Malinel
Co., Ltd. |
1999 |
C |
Reclamation and
Agricultural Land Development Project Development of 8000 acres of
agricultural land which involve flood
protection embankment, irrigation
and drainage canal system, intake
and drainage structures.
|
8000 ac |
Topographic Survey, Hydrological
Investigation and Detailed Design
|
Bago |
Letpadan |
Myan Naing Myint Co., Ltd.
|
1999 |
C |
Tabak Hydrpower Project Run-of-river hydropower scheme of installed capacity 24 MW |
24 MW |
Feasibility Study, Site Investigation works and Detailed Design. |
Kachin |
Near Hpawtaw |
Kachin Independent
Organization |
2000 |
C |
Kankalay Pump Irrigation
Project To develop irrigable area of 4500 acres
|
4500 ac |
Topographic survey works and Final
Design of the Irrigation Scheme
|
Yangon
|
Hmawbi |
Water Resources Utilization Department, MOAI
|
2010 |
C |
Meiktila Plain Pump Irrigation
Project |
|
Design of flood protection and
Drainage works planning and
design works for water extraction
by caisons
|
Mandalay |
Wundwin |
WRUD MOAI
|
2012 |
C |
Yaybudalin Pump Irrigation Project |
1 Site |
Topographic survey and remodelling of existing irrigation system |
Sagaing |
Monywa (Budalin)
|
WRUD MOAI |
2012 |
C |
Shweggyin Hydropower
Project |
200 GWh 207 ft ht |
Shwegyin hydropower
Project |
Bago |
Shwegyin
|
DHP, MOEP |
2002 |
C |
Reclamation and
Agricultural Land Development Development of 8000 acres of
agricultural land which involve flood
protection embankment, irrigation
and drainage canal system, intake
and drainage structures.
|
8000 ac |
Topographic Survey, Hydrological
Investigation and Detailed Design
|
Bago |
Letpadan |
Myan Naing Myint Co., Ltd. |
1999 |
C |
Tebokan Agricultural
Development Project Construction of an earth dam of
45000 cu-yd for impounding of
water for agricultural use
|
45000 cuyd
|
Investigation, Design and
Construction Quality Control.
|
Magwe
|
Salin
|
Asia World Co., Ltd.
|
1999 |
C |
Reclamation and
Agricultural Land Development Development of 8000 acres of
agricultural land which involve flood
protection embankment, irrigation
and drainage canal system, intake
and drainage structures.
|
8000 ac |
Topographic Survey, Hydrological
Investigation and Detailed Design
|
Bago |
Letpadan |
Myan Naing Myint Co., Ltd. |
1999 |
C |
Tabak Hydropwer Project Run-of-river hydropower scheme of installed capacity 24 MW |
24 MW |
Feasibility Study, Site Investigation works and Detailed Design. |
Kachin |
Near Hpawtaw |
Kachin Indepandant
Organization |
1999 |
C |
Thilawa Economic Zone Project
|
|
Investigation and conceptual
design for a drainage and flood
control system for a special
economic zone of 15000 ac
lying along a tidal river
|
Yangon Division |
Thanlyin Township |
Department of Human
Settlement and
Housing Development
|
Jul, 2011 |
C |
Sustainable Management of
Water to Improve Food Security
and Livelihoods in the Dry Zone
of Myanmar
|
|
Collection of biophysical data,
relevant information on the
Dry Zone
Assistance in field visits and
related workshops.
|
Mandalay, Magway and
Sagaing Division
|
|
International Water
Management Institute
|
Jun, 2013 |
C |
Linear and Topographic Survey
for Existing Irrigation Systems
|
|
Longitudinal linear and cross
section survey of existing
canals and access roads and
topographic survey of model
farms
|
Bago Division |
Pyay and Thayawaddy Township,
|
Sanyu Consultants Inc.
|
Aug, 2013 |
C |
Village Water Supply System
Construction Project
|
|
Renovation of existing water
ponds and appurtenant
structures including silt trap,
water supply pipe system
|
|
Chauk, Myaing and
Kawhmu Township |
Village Development
Committee of
corresponding villages
through Japanese
Embassy
|
Aug, 2013 |
C |
A Mini-Study of the Potential
of Rehabilitation of Canal
Systems in Gravity Irrigation
Schemes in the Dry Zone
|
|
Explore existing irrigation canal
systems, farmers' participation
and options for improvement of
management.
|
|
|
UNOPS and
Livelihoods and Food
Security Trust Fund
(LIFT)
|
Aug, 2013 |
C |
Environmental and Social Impact
Assessment for the World Bank
Project of Upgrading Thaton
Gas Turbine Project
|
|
Environmental and Social Impact Assessment
|
Mon State
|
Thaton |
Norconsult of Norway
|
May, 2013 |
C |
Rehabilitation Irrigable Network
of North Nawin, South Nawin,
Taungnyo, Wegyi Dams ( 4 Dams)
|
|
Topographic Survey Work for
Canals Rehabilitation for 4
Irrigation Command Areas
|
Pyay District
|
Tharyarwady Township
|
Sanyu Consultants International
|
2013 |
C |
Village Water Supply System
Construction Project
|
|
Renovation of Existing Water
Ponds and Appurtenant
Structures including Water
Supply Pipe System
|
Yangon Region
|
Kaw Hmu Township |
Village Development
Committee of
Corresponding Village
through Japanese
Embassy
|
2013 |
C |
Kyaington Hydropower Project
|
|
Topographic Survey, Hydrological Investigation and Geological Investigation
|
East Shan State
|
Kyaington Township,
|
Kyaington Electrical Co., Ltd.
|
2015 |
C |
Kyauk Phyu Reservoir Project
|
|
Topographical, Hydrological and Geological Investigation, Reservoir and Spillway Design and Cost Estimate
|
YaKhine State
|
|
GE
|
2015 |
C |
Monywa Drainage Survey Project
|
|
Topographic Survey
|
Sagaing Region
|
Monywa Township
|
Monywa Township Development Committee
|
2015 |
C |
Drainage Projects for (2012-2016)
|
|
Investigation and Conceptual Design for Drainge and Flood Control System
|
Yangon Region
|
Thanlyin Township,
Kyi Su Village,
Zawtika Housing,
Kyibwaye Housing,
Dagon Seikkan Township,
Lower Price Building,
Nyaung Ywa,
Dine Su, Hlaingtharyar Township,
Shwe Lin Ban, Hlaingtharyar Township,
Kyan Pyo, Hlaingtharyar Township,
Yuzana Housing, South Dagon Township,
Kyar Gyi, South Dagon Township,
Aye Yar Wun Housing, Dagon Seikkan Township,
Yoma Housing
|
Department of Human Settlement and Housing Development
|
2015 |
C |
Drainage Projects for (2012-2016)
|
|
Investigation and Conceptual Design for Drainge and Flood Control System
|
Ayeyarwady Region
|
Ohn Mar Dandee, Pathein Township
|
Department of Human Settlement and Housing Development
|
2015 |
C |
Myanmar Irrigated Command Area Development PPTA
|
|
Topographic Survey Work for Rehabilitation of Existing Canals and Hydraulic Structures
|
Magway Region
|
Pyawbwe & Natmauk Township |
Mott-Macdonald, England
|
Sept 2016 |
C |
Mawtin Water Supply Project
|
|
Topographical, Hydrological and Geological Investigation and Dam and Pipeline Design
|
Ayeyarwady Region |
Ngaputaw Township, |
Myanmar Coffee Company Pte. Ltd. |
2016 |
C |
Climate Friendly Agribusiness Value Chain Sector Project
|
|
Topographic Survey Work for Land (Laser Method Land Leveling) for Irrigation and Flood Protection of Ayeyarwady River
|
Mandalay Region |
Pakokku Township, |
ADB (Asian Development Bank) |
Feb 2017 |
C |
MinHla Hydropower Project
|
|
Environmental and Social Impact Assessment
|
Northern Shan State |
Naungcho Township |
Momentum Co., Ltd. |
May 2015 |
C |
Cavern Island Resort Project
|
|
Environmental and Social Impact Assessment
|
Tanintharyi Region |
Kawthoung Township |
KMOT Co. Ltd. |
Apri 2017 |
C |
Manufacturing of Electrical Switch Boards Sheet Metal Component and Steel Receiver Project
|
|
Initial Environmental Examination
|
Yangon Region |
South DagonTownship |
CMI Engineering Co., Ltd |
March 2017 |
C |
Agriculture Income Improvement Project Shwebo, Sagaing Region (Covering 8 Townships)
Thaphanseik Dam, the Largest Command Area of Myanmar
|
|
"Topographic Survey Work and Soil Science Investigation"
|
Sagaing Region |
Shwebo Township |
Sanyu Consultants International |
Dec 2016 |
C |
Middle Yeywa Hydropower Plant Project
|
|
Technical Feasibilities-Phase I (Geological Investigation and Topographic Surveying)
|
|
|
Tractebel Engineering S.A., Company, France |
Jul 2017 |
C |
Mann Amara Development Project
In front of Wayyawsana Jade Pagoda
(Myitnge, Amarapura Township)
|
|
Topographic Survey Work
|
Mandalay Region |
Amarapura Township |
Mann Amara Development Co., Ltd. |
Jun 2016 |
C |
Shwe Gon Landmark Mixed-use Development Project (Yangon)
|
|
Survey and Analysis of Drainage System Design
|
Yangon |
|
Shwe Gon Development Group Co., Ltd. |
Oct 2018 |
C |
Pintaya Estate Development Project
|
|
- Execution of water source
investigation, geological investigation
and design works for tank no. (N-7)
- Investigation work of water supply
for plantation
- Topographic survey work of
4 ponds, renovation design for
Thayetpya Pond
|
Shan State |
|
Forever Co., Ltd. |
Nov 2018 Feb 2019 June 2019 |
C |
Sub Surface and Foundation
Investigation |
|
Subsurface investigation |
Yangon |
Australia embassy compound |
Australia Embassy |
2008 |
C |
Pahtet reservoir project |
20 million gallon |
Pahtet reservoir project |
Tanintharyi |
Myeik |
Pyi Phyo Tun Co., Ltd. |
2009 |
C |
Environmental Impact
Assessment on Hydropower Development of Ayeyarwady River Basin above Myitkyina, Kachin
State, Myanmar |
Preliminary investigation
of ennvironment al base line survey on
hydropower development of Ayeyarwady river above
Myitkyina. |
In Cooperation with BANCA,
water quality survey of selected sites were
undertaken |
Kachin |
Myitkyina
|
BANCA (Biodiversity And
Nature Conservation Association) |
2009 |
C |
Pump Irrigation Project |
1 Site |
Topographic survey and
foundation soil |
Sagaing |
Monywa (Budalin)
|
WRUD |
2011 |
C |
Pump Irrigation Project |
1 Site |
Topographic survey and
foundation soil investigation |
Mandalay |
Sinkkaing
|
WRUD
|
2011 |
C |
Water Supply for Cement
Factory |
500000 gals per day |
Pick-up weir |
Mandalay |
Thasi |
Olypic Co., Ltd. |
2011 |
C |
Supervision of Test
Embankment |
39 polders
84-sluices |
1.0 km |
Labutta |
Labutta
Bogalay
Pyapon
Ngaputaw
Kyaiklat
Pindaya |
Consortium of Sanyu
Consultant Inc. & Nippon Koei Co., Ltd. (JICA) |
2010 |
C |
Inventory Survey for
Existing Polder dikes and sluices |
39 polders
84-sluices |
Inspiration and data
collection |
Ayeyawady |
Labutta
Bogalay
Pyapon
Ngaputaw
Kyaiklat
Pindaya |
Consortium of Sanyu
Consultant Inc. & Nippon Koei Co., Ltd. (JICA) |
2010 |
C |
Construction Supervision
of Dike Embankment and Sluice Gate
Rehabilitation |
39 km of Dike 6 Sluice |
Rehabilitation |
Ayeyarwady |
Labutta |
Consortium of Sanyu
Consultant Inc. & Nippon Koei Co., Ltd. (JICA) |
2010 |
C |
The Feasibility Study and
Preliminary Engineering Design for Irrigation
Department of Phyu Chaung Dam Multi-purpose
Project |
Feasibility Study and
Design of Irrigation Drainage and Flood Control
of Phyu Chaung Dam Irrigable Area of 100000
acres |
Design of Irrigation and
Drainage Structures and Canal Design of Flood
Control System with Embankment |
Bago |
Phyu
|
Irrigation Department |
2009 |
C |
Water Supply for Sea-weed
Factory |
300000 gals/day |
Pick-up weir and 6" Ø
Pipeline
|
Tanintharyi |
Myeik |
MSC Co., Ltd. |
2009 |
C |
Lumbani Academy, Two storey R.C.C building of floor
area 34000 sq-ft.
|
floor area 34000 sqft
|
Construction including M & E
works.
|
Yangon |
Thingangyun |
Lumbani Group
|
2006 |
IC |
Bwet Kyee Dam Project , Construction of irrigation system
|
|
Bored pile foundation at
Thanbyla Chaung for irrigation flume structure
|
Magwe |
Aunglan |
Irrigation Department |
2006 |
IC |
Water Intake Bank
Protection Works |
1000 ft length |
Spur and stone pitching |
Ayeyarwady |
Thabaung |
Ministry of Industry |
2005 |
C |
|
|
network for water supply
pulp mill project |
Ayeyarwady |
Pyinywa, Myaungmya |
Ashin Eindaka, USA |
2003 |
C |
Training Programme on Piped
Water Supply System
- Bawsaing village, Kalaw
Rural water supply from a small
reservoir through pipeline system.
|
|
Study on dam failure and finding
out remedial measures. Training
to some CWSS staff on
implementation of mini dams.
|
Shan |
Kalaw |
Community of
Water Supply
and Sanitation,
UNDP
|
2001 |
IC |
Water Supply for Suger
Mills |
10 million gal per day |
Design and construction works for water supply of eight sugar mills each having an average demand of 10 million gallon per day. |
Central Myanmar |
|
Water Resources Utilization Dept. MOAI |
1999 |
C |
Tebokan Agri Development |
45000 cuyd |
Earth dam |
Magwe |
Salin |
Asia World Co.Ltd. |
1999 |
C |
Water Supply Project , Mongshu Gem land
Water supply of 30000 gph for a
net head of 850 ft by multi-stage
pumps.
|
80000 gph |
Investigation, Design and
Construction Supervision
|
Shan |
Mongshu gemland |
Shan Yoma |
1999 |
C |
Heap Leach Pad Construction
Myanmar Ivanhoe Copper Co., Ltd.
Construction of 8 nos. of cells of
leach pad (700 m x 80 m) which
involves laying of impervious soil
layer, HDPE liner, cushion and
drainage layer. |
700 x 80 sqm |
Consultancy services in contract
bidding. After award of contract,
provision of resource persons
and consultancy services for
project implementation.
|
Sagaing |
Monywa |
Soo-pin Co. |
1999 |
C |
Garment Factory A garment factory for 300 sewing machines
including canteen and office. |
300 sewing |
Detailed Design and Construction
|
Yangon |
Hlaingtharyar |
Myanmar Guston Malinel
Co., Ltd. |
1999 |
C |
EIA Special Investigation for
Hydropower Planning
of Ayeyarwady River Basins
above Myitkyina,
Hydropower Generation
by 7 Cascade Dams
|
|
Detailed Design and Construction
|
Kachin |
Myitkyina |
China power Investment
corporation (CPI) and
Biodiversity And Nature
Conservation Association
(BANCA) Myanmar.
|
2009 |
ESIA |
Great China Dormitory Blk 1 & 2
- Mingalardon Industrial Park
Dormitory Buildings and Ground
Tank construction for water supply.
|
|
Construction of bored pile foundation (172 no) and R.C.C ground tank.
|
Yangon |
Mingalardon |
The Tokyo Enterprise |
2004
|
IC |
Preservation of Farming Area
for Urgent Rehabilitation of
Agricultural Production and
Rural Life in Areas affected
by Cyclone Nargis
- Ayeyawady Division
A project granted by JICA
for Cyclone Nargis affected area.
|
|
Construction Supervision
of Model Embankment
|
Ayeyawady Division |
|
Consortium of
Sanyu Consultants
Inc. and Nippon
Koei Co., Ltd.
Japan
|
May, 2010
|
|
Kubyin Diversion Weir Project
- Thazi T.S, Mandalay Division
Construction of a diversion weir
for piped water supply to
Cement Factory
|
|
Construction and Quality
Control of a concrete
diversion weir
|
Mandalay Division |
Thazi T.S |
Shwe Taung
Development Co., Ltd.
|
May, 2011
|
C |
EIA and SIA Study for
Baluchaung 3 Hydropower
Project
|
|
EIA and SIA Study Report including
Assessment on Environmental Flow
Flora, Fauna, Fishery and Socio
Socio-Economic Study
|
Kayah State
|
Lawpita |
High Tech Concrete
Technology Co., Ltd.
|
Jul, 2012
|
C |
Mya Sein Yaung Industrial Estate
|
|
Investigation and Conceptual
Design for Drainage and Flood
Control for Industrial Estate
|
Yangon Region
|
Hlaingtharyar |
Shwe Taung
Construction Co., Ltd.
|
2012
|
C |
Environmental and Local
Community Survey for
Feasibility study on small Scale
Hydropower Development with
Existing Irrigation Dams in Myanmar
|
|
- Survey on Environmental
Laws and Regulations for
Hydropower Development
- Social Survey on Local
Community
|
Bago and Ayeyarwady Division
|
|
Electric Power
Development Co., Ltd.
( J-Power)
Japan
|
Jan, 2013
|
C |
Preparatory Survey for
Environmental and Social
Considerations
|
|
Screening, Preliminary
Environmental Review and
Formulation Draft Monitoring Plan
|
Yangon Division
|
Thilawa Special Economic Zone
|
Sanyu Consultants Inc. Japan
|
Feb, 2013
|
C |
Inventory Survey of Existing Wells
Data Collection Survey on Water
Resources Potential for Thilawa
Special Economic Zone and
Adjoining Areas
|
|
- Digitalization and Creating
a database of existing Well Data
- Questionnaire and Field Inventory
Survey on Facilities of each
Existing Well
|
Yangon Division
|
Thilawa Special Economic Zone |
Sanyu Consultants Inc. Japan
|
May, 2013
|
C |
EIA and SIA Study for POL
Storage and Port Facilities
Project
|
|
In Association with Norconsult
of Norway Study on EIA and SIA
of the Project Including
Baseline Conditions, Environmental
Risks and Concerns, Mitigation,
Management and Monitoring
|
Yangon Division
|
Thilawa Special Economic Zone
|
Collective Companies,
Myanmar Petroleum
Trade Association
|
May, 2013
|
C |
Hydrological Survey and Water
Quality Monitoring
- Yangon and Bago Division
Data Collection Survey on Water
Resources Potential for Thilawa
Special Economic Zone and Adjoining Areas
|
|
- Ground Water Level and Quality
Survey
- Installation of River Gauging
Station, River Discharge Survey
and Topo-Survey
- Surface Water Quality Survey
|
Yangon and Bago Division
|
Thilawa Special Economic Zone and Adjoining Areas
|
Sanyu Consultants Inc. Japan
|
May, 2013
|
C |
Mandalay City Flood
Mitigation Master Plan
|
|
Preliminary survey and design
for the master plan including
design of flood ways for
Mandalay east area.
|
Mandalay Division
|
|
Irrigation Department
Ministry of Agriculture
and Irrigation
|
Jan, 2011
|
C |
Hydrology Study of the Minbu
Solar Plant Project Area
|
|
Hydrology Study Report for Minbu Solar Plant Area
|
Magway Region
|
Minbu
|
Green Earth Power (Thailand) Co., Ltd.
|
Aug, 2015
|
C |
Preliminary EIA (Environmental
Impact Assessment) on Middle
Yeywa Hydropower Project (2015)
|
|
Initial Environmental Impact Assessment
|
Shan State
|
Naungcho Township
|
SN Power Invest Asia Pte. Ltd. of Singapore
|
2015
|
C |
ShukhinThar Jetty Project
|
|
Initial Environmental Examination
|
Yangon Region
|
Thaketa Township
|
Myatnothu Co., Ltd
|
2015
|
C |
Concrete Production Project
|
|
Initial Environmental Examination
|
Yangon Region
|
Thaketa Township
|
High Tech Concrete Co., Ltd
|
2015
|
C |
Timber Factory Project
|
|
Initial Environmental Examination
|
Yangon Region
|
Kyimyindine Township
|
Manawphyu Co., Ltd
|
2015
|
C |
ESIA works on Mawlamyine Clean Tap Water Supply Project
|
|
Environmental and Social Impact Assessment
|
Mon State
|
Mawlamyine
|
TTW (Thai Tap Water) Public Company Limited of Thailand
|
Jan 2016
|
C |
Manufacturing of Electrical Switchgear and Control Panel Project
|
|
Initial Environmental Exemination
|
Yangon Region
|
Ngwepinlel Industrial Zone
|
Myanmar Young In Co., Ltd.
|
Jan 2016
|
C |
Soap Factory Project
|
|
Environmental and Social Impact Assessment
|
Yangon Region
|
Hlaing Township
|
Myat Miba Company Limited, Myanmar
|
May 2016
|
C |
Danyingone Fruits, Vegetables and Flowers Wholesale Market
|
|
Environmental and Social Impact Assessment
|
Yangon Region |
Insein Township |
Myanmar Agro Exchange Public Limited
|
Aug 2016 |
C |
Soft Drinks Factory Project
|
|
Initial Environmental Examination
|
Yangon Region
|
Yangon Industrial Zone
|
Asia Pacific Beverages Myanmar Company Limited
|
Oct 2016
|
C |
Salingon, Anyar Daw and Kyauktagar Project
|
|
Renovation of Existing Dam and Canal
|
Yangon Region |
Insein Township |
Oisca of Japan |
2016 |
C |
Dry Port Project at YwaThaGyi
|
|
Initial Environmental Examination |
Yangon Region |
Ywathagyi |
Resources Group Logistics Co., Ltd |
2016 |
C |
Myitnge Dry Port Project
|
|
Initial Environmental Examination
|
Mandalay Region |
Myitnge |
KLN Singapore Ltd |
2016 |
C |
The Construction of a modern Multi-purpose international wharf and integrated agriculture
processing facilities and associated utility buildings at Thilawa SEZ (Special Economic Zone), Plots 20, 21 and triangle
area between Plots 21and 22.
|
|
EIA and SIA works with RAP(Resettlement Action Plan) |
Yangon Region |
Thilawa SEZ (Special Economic Zone) |
Wilmar Investment Holdings, Pte. ltd., Singapore |
2016 |
C |
Pyawt Ywa Pump Irrigation Project (Rehabilitation)
|
|
Improving scheme operations and management to ensure stronger community involvement (in associate with IWMI, Lead Consultant)
|
Sagaing Region |
Myinmu Township |
Irrigation and Water Utilization Management Department |
Mar 2019 |
C |
Myauk Oo Airport Development Project
|
|
Flood protction, drainage planning and design for the project area which
is prone to flood due to the nearby Lemro river and the heavy rainfall nature.
|
Rakhine State |
Myauk Oo |
Su Htoo San Construction Co., Ltd. |
Oct 2016 |
C |
Development of the Ayeyarwady Decision Support System and Basin Master Plan
|
|
Decision support system, river basin management, capacity building, stakeholder management and database management in associate with Arcadis,Lead Consultant, Netherland.
|
|
|
Directorate of Water Resources and Improvement of River System (DWIR) |
Mar 2019 |
C |
Integrated Ayeyarwady Delta Strategy Bank and Bed ProtectionAyeyarwady River at Nyaungdon
Rapid Multi-Hazard Risk Assessment of the Yangon Region Water Supply Network and Infrastructure Systems
|
|
Seconded to Arcadis to work as Junior River and Coastal Engineerand to a Junior Ports and WaterwaysExpert at the IADS project office.
Supporting function for Bank and Bed Protection Ayeyarwady River at Nyaungdone Project and other water management projects.
|
Yangon Region |
|
Arcadis Nederland B.V Netherlands |
Aug 2019 |
C |
Pan Hlaing Sluice Project
|
|
Assessment of historical background
of river system development Pan
Hlaing over the last 50 years. Data
collection for land use, irrigation water
demand, operation methods of current
irrigation system, waste water
discharges, the layout of the current
irrigation and drainage system,
historical floods and areal elevations.
Providing support in the definition of
the system and sluice design criteria
and contribute to general findings and
recommendations. Contribute to capacity
building and knowledge transfer to selected
staff from Irrigation and Water Utilization
Management Department.
|
|
|
Haskoning DHV Myanmar |
Dec 2018 |
C |
Kuaukse Gas Combined Cycle Power Plant Construction Project(Preparatory Survey)
|
|
Execution of data collection of weather conditions and natural disaster.
|
Mandalay Region |
Kyaukse Township |
Nippon Koei Co., Ltd. |
Mar 2019 |
C |
Nawa Reservoir Project
|
|
Impoundment of runoff water by constructing an earthen dam across the Nawa Stream to distribute water
for Mong Yai down town area and nearby villages with drinking, domestic and agricultural water supply.EIA works on Project.
|
Northern Shan State |
Mong Yai Township |
Deputy Director's Office Agriculture Livestock and Irrigation, IWUMD Lashio Shan State (North) |
Oct 2017 |
C |
Production of Road Metal (Road Pavement Rock) Project at Kaylartha Reserve Forest
|
|
EMP (Environmental Management Plan) for project implementation. IEE and EMP works on Project.
|
Mon State |
Belin Township |
Rock Well Mining Co., Ltd. |
Jan 2017 |
C |
“Sand to Agri” Project
|
|
Sand Dredging Activities, Thandwe River Mouth IEE and EMP works on Project.
|
Rakhine State |
Thandwe Township |
"Golden Sunflower "Energy Co., Ltd. |
Feb 2018 |
C |
Concrete Admixture and Cement Grinding Aids Project MyaSeinYaung Industrial Zone
|
|
EMP (Environmental Management Plan) for project implementation.
|
Yangon |
Hlaing Thayar Township |
FOSROC Co.Ltd. |
Feb 2017 |
C |
Phyu Shopping Center Project
|
|
EMP (Environmental Management Plan) for project implementation.
|
Bago District |
Phyu Township |
HI STAR Co.Ltd. |
Jun 2017 |
C |
Supply and Installation of 230 kV Substation Project
|
|
IEE (Initial Environmental Examination) works on Project
|
Eastern Shan State |
Kengtong, Mine Pyine and Namsam Township |
Myanmar Young In Co.Ltd. |
Nov 2017 |
C |
Tank Firm & Jetty Project
|
|
Environmental and Social Impact Assessment
|
Yangon Region |
Thanlyin Township |
Apex Union Gas Co., Ltd. |
Ongoing |
C |
Tank Firm & Jetty Project
|
|
Environmental and Social Impact Assessment
|
Yangon Region |
Thanlyin Township |
IGE Services Co., Ltd. |
Ongoing |
C |
Tank Firm & Jetty Project
|
|
Environmental and Social Impact Assessment
|
Yangon Region |
Thanlyin Township |
KMA SIAM Limited(KSL) |
Ongoing |
C |
Kyetpahmwesaung Polder Management Project
|
|
An Assessment on comparison of initial stage and existing stage of the Kyetpahmwesaung Polder after Nargis Cyclone affect.
|
Ayeyarwady Region |
Pyapon Township |
Welthungerhlife Myanmar Co., Ltd. |
Mar 2018 |
C |
IEE with EMP for Develop a Manufacturing, Installation and Marketing of Electric Control
Panel and Switch Gear Panel Project Ngwe Pinle Industrial Zone,
|
|
IEE (Initial Environmental Examination) Works & EMP(Environmental Management Plan)
|
Yangon Region |
Hlaing Tharyar Township |
MYD International Co. Ltd. |
Feb 2017 |
C |
Mya Khwar Nyo Apartment Project Plot No. 61, 62 up to 71, 78
|
|
Environmental and Social Impact Assessment
|
Yangon Region |
Thaketa Township |
Yangon Golden River Investment Co. Ltd. |
Oct 2018 |
C |
Chemical Tank Terminal Project
|
|
Environmental and Social Impact Assessment
|
Yangon Region |
Thanlyin Township |
Thuriya Energy Deport Management Co. Ltd. |
Jan 2019 |
C |
Dry Ports Project
|
|
Initial Environmental Examination
|
Yangon Region |
Ywathagyi Township |
Resources Group Logistics Co. Ltd. |
Jan 2019 |
C |
Dry Ports Project
|
|
Initial Environmental Examination
|
Mandalay Region |
Myitnge Township |
Resources Group Logistics Co. Ltd. |
Jan 2019 |
C |
Circuit Breaker Assembling Project
|
|
Initial Environmental Examination and Environmental Management Plan
|
Yangon Region |
North Dagon Township |
Winner Power International Co. Ltd. |
Jan 2019 |
C |
Myanmar World Trade Center Project(Adjacent to No. 3 Highway (Yangon-Mandalay), Plot No. 1-143,
|
|
Initial Environmental Examination and Environmental Management Plan
|
Yangon Region |
Mingalardon City |
Datong Holding Co., Ltd. |
Apr 2019 |
C |
Coal Mine Production Project
|
|
Environmental and Social Impact Assessment
|
Sagaing Region |
Mawlaik Township |
Myanmar Kaungtong Industrial Co. Ltd. |
Mar 2019 |
C |
Soft Drink Factory Project
|
|
Initial Environmental Examination
|
Yangon Region |
Mingalardon Township |
Asia Pacific Beverages Myanmar Co. Ltd. |
Apr 2019 |
C |
Aqua Feed Mill Factory Myaungdagar Industrial Zone
|
|
Environmental and Social Impact Assessment
|
Yangon Region |
Hmawbi Township |
Aqua Feed Mill Factory |
Aug 2019 |
C |