Project Name, Location and Description
|
Client
|
Services Undertaken
|
Progress
|
Remark
|
Garment Factory
-Hlaing Tharyar
A garment factory for
300 sewing machines offices
|
Myanmar Guston
Molinel Co., Ltd.
|
Detailed Design and Construction
|
Completed
in 1999
|
PD & IC
|
Water Supply for Sugar Mills
- Central Myanmar
|
Water Resources
Utilization Dept.
MOAI
|
Design and construction works
for water supply of eight sugar
mills each having an average
demand of 10 million gallon
per day.
|
Completed
in 1999
|
PD & IC
|
Tabak Hydropower Project
- Kachin State
Run-of-river hydropower scheme
of installed capacity 24 MW
|
Kachin
Independent
Organization
|
Kachin
Independent
Organization
|
Completed
in 2000
|
SI & PD
|
Heap Leach Pad Construction
Myanmar Ivanhoe Copper Co., Ltd.
- Monywa
Construction of 8 nos. of cells of
leach pad (700 m x 80 m) which
involves laying of impervious soil
layer, HDPE liner, cushion and
drainage layer.
|
Soo-pin Co., Ltd.
|
Consultancy services in contract
bidding. After award of contract,
provision of resource persons
and consultancy services for
project implementation.
|
Completed
in 1999
|
IC
|
Water Supply Project
- Mongshu Gem land
Water supply of 30000 gph for a
net head of 850 ft by multi-stage
pumps.
|
Shan Yoma
Co., Ltd.
|
Investigation, Design and
Construction Supervision
|
Completed
in 1999
|
SI & IC
|
Reclamation and Agricultural
Land Development Project
- Letpadan
Development of 8000 acres of
agricultural land which involve flood
protection embankment, irrigation
and drainage canal system, intake
and drainage structures.
|
Myan Naing Myint
Co., Ltd.
|
Topographic Survey, Hydrological
Investigation and Detailed Design
|
Completed
in 1999
|
SI & PD
|
Tebokan Agricultural Development
Project
- Salin
Construction of an earth dam of
45000 cu-yd for impounding of
water for agricultural use
|
Asia World
Co., Ltd.
|
Investigation, Design and
Construction Quality Control.
|
Completed
in 1999
|
PD & IC
|
Study of Quarry Sites at Kalegauk
Island
- Ye, Mon State
Production of breakwater armour
stones.
|
Myan Naing Myint
Co., Ltd.
|
Topographic survey and geological
study of quarries and jetty sites
|
Completed
in 2000
|
SI
|
Kun Hydropower Project
- Phyu
Storage type hydropower scheme
of installed capacity 60 MW
involving a 200 ft high rock fill dam.
|
Myanma
Electric Power
Enterprise
|
Feasibility Study and Detailed
Design.
|
Completed
in 2003
|
PD
|
Kokang Rural Development
Project
- Northern Shan State
Improvement of the existing rural
road of 74 km length and
development of a small hydropower
scheme.
|
Katahira and
Engineers Intl.,
Japan
|
Topographic survey and
geotechnical investigation works
for the preliminary design.
|
Completed
in 2001
|
SI
|
Leprosy Control and Basic Health
Services Project
- Mandalay
Construction of training centre,
dormitory and special skin clinic.
|
JICA
|
Review of Design and Quality
Assurance.
|
Completed
in 2001
|
PD
|
Training Programme on Piped
Water Supply System
- Bawsaing village, Kalaw
Rural water supply from a small
reservoir through pipeline system.
|
Community of
Water Supply
and Sanitation,
UNDP
|
Study on dam failure and finding
out remedial measures. Training
to some CWSS staff on
implementation of mini dams.
|
Completed
in 2001
|
IC
|
Yeywa Hydropower Project
- Mandalay Division
A storage type hydropower scheme
of 3550 GWh involving a roller
compacted concrete dam.
|
a. Colenco Power
Engineering Ltd.,
Switzerland
b. Ministry of
Electric Power
|
a. Local counterpart to CPE for
engineering and AutoCAD
Services
b. Hydraulic Model study for
bottom outlet and spillway of
the project ( in cooperation with
irrigation Technology Centre of
Irrigation Department )
|
Completed
in 2012
Completed
in 2002
|
SI
|
200 Ton per day Pulp Mill Project
- Thabaung, Ayeyarwady Division
Construction of pulp mill; design
and quality assurance by China
Metallurgical Construction (Group)
Corporation (MCC)
|
Ministry of Industry
No.(1)
|
Construction works mainly in Area
5 of the Project which includes
water intake pump station, supply
water purification station and
effluent treatment plant. The
works involve about 22000 cu-m
of reinforced concrete mostly of
water tight structures. Also
undertook installation of intake
pipe line from river, some
mechanical and electrical
installation works, construction of
pipe support bridge, pontoon
bridge, drainage network and
some insulation works.
|
Completed
in 2005
|
IC
|
Loka Chan Tha Bridge
- Pyinywa, Myaung Mya
R.C.C bridge of 100 ft span and
15 ft width.
|
Ashin Eindaka
residing at
USA
|
Design and construction of R.C.C
bridge including 60 ft deep bored
pile foundation work.
|
Completed
in 2003
|
PD & IC
|
Natdaung Reservoir Project
- Myeik
An earth dam of 73 ft height
impounding 4000 ac-ft of water
for town water supply.
|
Myan Naing Myint
Co., Ltd.
|
Topographic survey and geological
investigation of the reservoir area
and feasibility study.
|
Completed
in 2003
|
SI
|
Shwegyin Hydropower Project
- Shwegyin, Bago Division
A storage type hydropower project
involving 207 ft earth dam and
generating 200 GWh.
|
Department of
Hydroelectric Power
Ministry of Electric
power
|
Prefeasibility study and
hydrological investigation.
Detailed topographic survey
of dam site.
|
Completed
in 2002
|
SI
|
Pataw Reservoir Project
- Myeik
A 68 million gallon capacity
reservoir for industrial and
domestic water supply.
|
Pyi Phyo Tun
Co., Ltd.
|
Investigation, feasibility study,
detailed design and construction
supervision.
|
Completed
in 2004
|
SI, PD & IC
|
Great China Dormitory Blk 1 & 2
- Mingalardon Industrial Park
Dormitory Buildings and Ground
Tank construction for water supply.
|
The Tokyo
Enterprise
|
Construction of bored pile
foundation (172 no) and R.C.C
ground tank.
|
Completed
in 2004
|
IC
|
Lumbani Academy
- Thingangyun, Yangon
Two storey R.C.C building of floor
area 34000 sq-ft.
|
Lumbani Group
|
Construction including M & E
works.
|
Completed
in 2006
|
IC
|
Wind Generator Project
- Ngwe Saung Beach
Installation of wind Generator of
500 KVA capacity.
|
Thiri Lwin
Co., Ltd.
|
Design and construction
supervision for wind generator
foundation.
|
Completed
in 2006
|
PD & IC
|
Kabin Dam Project
- Myeik
Construction of a reservoir for
town water supply of Myeik
extension.
|
Pyi Phyo Tun
Co., Ltd.
|
Topographical survey, geological
investigation, detail design and
technical supervision in
construction works.
|
Completed
in 2008
|
SI & IC
|
Bwet Kyee Dam Project
- Aung Lan
Construction of irrigation system
|
Irrigation Dept.
MOAI
|
Bored pile foundation at Thanbula
Chaung for irrigation flume
structure.
|
Completed
in 2006
|
PD
|
Upper Paung Laung Hydropower
Project
- Mandalay Division
A storage type hydropower scheme
involving a roller compacted
concrete dam
|
a. AF-Colenco Ltd.
Switzerland
b. Department of Hydro-
power Implementation
No.(1) Ministry of
Electric Power
|
a. Local counterpart for engineering
and AutoCAD Services
b. Hydraulic model study for bottom
outlet and spillway of the project.
|
Ongoing
Completed
in Aug 2009
|
SI
|
EIA Special Investigation for
Hydropower Planning
of Ayeyarwady River Basins
above Myitkyina
- Caching State
Hydropower Generation
by 7 Cascade Dams
|
China power Investment
corporation (CPI) and
Biodiversity And Nature
Conservation Association
(BANCA) Myanmar.
|
Environmental Baseline Study of
the Project Area which includes
Monitoring of surface water,
ambient air, acoustic environment
and pollution sources.
|
Completed
in Sep 2009
|
ESIA
|
Nacho Hydropower Project
- Mandalay Division
A storage type hydropower scheme
including concrete gravity dam
|
Department of Hydro-
power Implementation
No.(1) Ministry of
Electric Power
|
Hydraulic model study of spillway
in coopertion with Irrigation
Technology Centre
|
Completed
in May 2010
|
SI
|
Water supply project
- Myeik
Water supply and micro
hydropower scheme for
an Industry
|
MSC Co. Ltd.,
The Republic of Korea
|
Investigation, Design and
Construction of water
supply scheme
|
Completed
in 2010
|
SI, PD & IC
|
Baluchaung No.(3)
Hydroelectric Power Project
- Loikaw T.S, Kayah State
A cascade Hydropower
development providing 334 GWh/year
|
High Tech Concrete
Technology Co., Ltd
|
Hydraulic model study of Ht Intake
in cooperation with Irrigation
Technology Centre
|
Completed in
March 2010
|
SI
|
Kankalay Pump Irrigation Project
- Hmawbi T.S, Yangon Division
To develop irrigable
area of 4500 acres
|
Water Resources
Utilization Department,
MOAI
|
Topographic survey works and Final
Design of the Irrigation Scheme
|
Completed
in Dec 2010
|
SI & PD
|
Irrigation Development of
Phyu-chaung Dam Multi-purpose
Project
- Phyu T.S, Bago Division
To develop an irrigable area
of about 40,000 ha.
|
Irrigation Department,
Ministry of Agriculture
and Irrigation (MOAI)
|
The Consultancy Services for the
Feasibility Study and Preliminary
Engineering Design in Association
with SANYU CONSULTANTS INC,
Japan.
|
Completed
in July 2011
|
PD & IC
|
Shwe Hlan Bo Region
Greening Project
- Kyaukse T.S, Mandaly Division
To develop irrigable
area of 8750 acres
|
Water Resources
Utilization Department,
MOAI
|
Topographic survey of the area and
Final Design of Irrigation and
Drainage System
|
Completed
in Oct, 2010
|
SI & PD
|
Preservation of Farming Area
for Urgent Rehabilitation of
Agricultural Production and
Rural Life in Areas affected
by Cyclone Nargis
- Ayeyawady Division
A project granted by JICA
for Cyclone Nargis affected area.
|
Consortium of
Sanyu Consultants
Inc. and Nippon
Koei Co., Ltd.
Japan
|
a. Inventory Survey on Polder Dike
and Existing Sluice Gate
b. Geological Survey and Soil
Mechanical Investigation
c. Construction Supervision
of Model Embankment
d. Construction Supervision of Dike
Embankment and Sluice Gate
Rehabilitation
e. Topographic Survey Work of
Polder Dike
|
Completed in
Mar, 2010
Completed in
Mar, 2010
Completed in
May, 2010
Completed in
Apr, 2011
Completed
in Nov, 2011
|
SI & IC
|
Kubyin Diversion Weir Project
- Thazi T.S, Mandalay Division
Construction of a diversion weir
for piped water supply to
Cement Factory
|
Shwe Taung
Development Co., Ltd.
|
Construction and Quality
Control of a concrete
diversion weir
|
Completed
in May 2011
|
IC
|
Meiktila Plain Pump Irrigation
Project
- Wandwin T.S, Mandalay Division
|
WRUD
MOAI
|
Design of flood protection and
Drainage works planning and
design works for water extraction
by caisons
|
Completed
in Nov, 2012
|
PD
|
Latpan Pump Irrigation Project
- Hlegu T.S, Yangon Division
|
WRUD
MOAI
|
Topographic survey and design of
pump irrigation system
|
Completed
in Aug, 2012
|
SI
|
Yaybudalin Pump Irrigation
Project
- Monywa T.S, Sagaing Division
|
WRUD
MOAI
|
Topographic survey and remodelling
of existing irrigation system
|
Completed
in Dec, 2012
|
SI
|
EIA and SIA Study for
Baluchaung 3 Hydropower
Project
- Lawpita, Kayah State
|
High Tech Concrete
Technology Co., Ltd.
|
EIA and SIA Study Report including
Assessment on Environmental Flow
Flora, Fauna, Fishery and Socio
Socio-Economic Study
|
Completed in
July, 2012
|
ESIA
|
Mya Sein Yaung Industrial
Estate
- Hlaingtharyar Township
Yangon Region
|
Shwe Taung
Construction Co., Ltd.
|
Investigation and Conceptual
Design for Drainage and Flood
Control for Industrial Estate
|
Completed in
2012
|
SI
|
Environmental and Local
Community Survey for
Feasibility study on small Scale
Hydropower Development with
Existing Irrigation Dams in Myanmar
- Bago and Ayeyarwady Division
|
Electric Power
Development Co., Ltd.
( J-Power)
Japan
|
- Survey on Environmental
Laws and Regulations for
Hydropower Development
- Social Survey on Local
Community
|
Completed in
Jan, 2013
|
SI
|
Preparatory Survey for
Environmental and Social
Considerations
- Yangon Division
Thilawa Special Economic Zone
|
Sanyu Consultants Inc.
Japan
|
Screening, Preliminary
Environmental Review and
Formulation Draft Monitoring Plan
|
Completed in
Feb, 2013
|
ESIA
|
Inventory Survey of Existing Wells
Data Collection Survey on Water
Resources Potential for Thilawa
Special Economic Zone and
Adjoining Areas
|
Sanyu Consultants Inc.
Japan
|
- Digitalization and Creating
a database of existing Well Data
- Questionnaire and Field Inventory
Survey on Facilities of each
Existing Well
|
Completed in
May, 2013
|
SI
|
EIA and SIA Study for POL
Storage and Port Facilities
Project
- Yangon Division
Thilawa Special Economic Zone
|
Collective Companies,
Myanmar Petroleum
Trade Association
|
In Association with Norconsult
of Norway Study on EIA and SIA
of the Project Including
Baseline Conditions, Environmental
Risks and Concerns, Mitigation, Management and Monitoring
| Completed in
May, 2013
|
ESIA
|
Hydrological Survey and Water
Quality Monitoring
- Yangon and Bago Division
Data Collection Survey on Water
Resources Potential for Thilawa
Special Economic Zone and Adjoining Areas
|
Sanyu Consultants Inc.
Japan
|
- Ground Water Level and Quality
Survey
- Installation of River Gauging
Station, River Discharge Survey
and Topo-Survey
- Surface Water Quality Survey
|
Completed in
May, 2013
|
SI
|
Mandalay City Flood
Mitigation Master Plan
- Mandalay
|
Irrigation Department
Ministry of Agriculture
and Irrigation
|
Preliminary survey and design
for the master plan including
design of flood ways for
Mandalay east area.
|
Completed in
Jan, 2011
|
SI & PD
|
Thilawa Economic Zone Project
- Thanlyin Township, Yangon
|
Department of Human
Settlement and
Housing Development
|
Investigation and conceptual
design for a drainage and flood
control system for a special
economic zone of 15000 ac
lying along a tidal river
|
Completed in
July, 2011
|
SI
|
Sustainable Management of
Water to Improve Food Security
and Livelihoods in the Dry Zone
of Myanmar
- Mandalay, Magway and
Sagaing Division
|
International Water
Management Institute
| Collection of biophysical data,
relevant information on the
Dry Zone
Assistance in field visits and
related workshops.
|
June, 2013
|
SI
|
Linear and Topographic Survey
for Existing Irrigation Systems
- Pyay and Thayawaddy Township,
Bago Division
|
Sanyu Consultants Inc.
|
Longitudinal linear and cross
section survey of existing
canals and access roads and
topographic survey of model
farms
|
Completed in
Aug, 2013
|
SI
|
Village Water Supply System
Construction Project
1. Chauk Township
2. Myaing Township
3. Kawhmu Township
|
Village Development
Committee of
corresponding villages
through Japanese
Embassy
|
Renovation of existing water
ponds and appurtenant
structures including silt trap,
water supply pipe system
|
Completed in
Aug, 2013
|
SI
|
A Mini-Study of the Potential
of Rehabilitation of Canal
Systems in Gravity Irrigation
Schemes in the Dry Zone
|
UNOPS and
Livelihoods and Food
Security Trust Fund
(LIFT)
|
Explore existing irrigation canal
systems, farmers' participation
and options for improvement of
management.
|
Completed in
Aug, 2013
|
SI
|
Environmental and Social Impact
Assessment for the World Bank
Project of Upgrading Thaton
Gas Turbine Project
- Thaton, Mon State
|
Norconsult of Norway
|
Environmental and Social Impact Assessment
|
Completed in May 2013
|
ESIA
|
Rehabilitation Irrigable Network
of North Nawin, South Nawin,
Taungnyo, Wegyi Dams ( 4 Dams)
- Tharyarwady Township, Pyay District
|
Sanyu Consultants
International
|
Topographic Survey Work for
Canals Rehabilitation for 4
Irrigation Command Areas
|
Completed in
2013
|
SI
|
Village Water Supply System
Construction Project
- Kaw Hmu Township,
Yangon Region
|
Village Development
Committee of
Corresponding Village
through Japanese
Embassy
|
Renovation of Existing Water
Ponds and Appurtenant
Structures including Water
Supply Pipe System
|
Completed in
2013
|
SI
|
Seik Nyan Pump Irrigation
Project
- Mandalay Region
|
WRUD MOAI
|
Design of Flood Protection &
Drainage Works Planning and
Design Works for Water
Extraction
|
Completed in
2013
|
PD
|
Saw Chaung Hydropower Project
- Kanpetlet Township
Run-of the river type hydropower
scheme generating 2 MW.
|
Myat Noe Thu
Construction Co., Ltd.
|
Topographical, Hydrological
and Geological Investigation
Feasibility Design
|
Completed in
2014
|
SI
|
Mandalay Myotha Industrial
Development Project
- Myingyan Township,
Mandalay Region
|
Mandalay Myotha Industrial Development Public Company Limited
|
"Design of Land Preparation, Road Formation and Storm Water Drainage Design for Causeway, Culverts and Road Side Drain on Port Link Road, Design of Dam and Water body for Initial Phase, Area, Design for general Cargo Yard and Ramp on Semeikkon Port
"
|
Completed in Aug, 2014
|
PD
|
Rubber Factory Project
- Belin, Mon State
|
Max Myanmar Co., Ltd
|
Initial Environmental Examination
|
Completed in 2014
|
ESIA
|
Shoe Factory Project
- Hlainhtharyar Township,
Yangon Region
|
Tian Yu International Co., Ltd
|
Initial Environmental Examination
|
Completed in 2014
|
ESIA
|
Okkan Sugar Factory Project
- Taikkyi, Yangon Region
|
Golden Myan-Tai Co.,Ltd
|
Environmental and Social Impact Assessment
|
Completed in July 2015
|
ESIA
|
Hydrology Study of the Minbu
Solar Plant Project Area
- Minbu, Magway Region
|
Green Earth Power (Thailand) Co., Ltd.
|
Hydrology Study Report for Minbu Solar Plant Area
|
Completed in Aug, 2015
|
SI
|
Preliminary EIA (Environmental
Impact Assessment) on Middle
Yeywa Hydropower Project (2015)
- Naungcho Township, Shan State
|
SN Power Invest Asia Pte. Ltd. of Singapore
|
Initial Environmental Impact Assessment
|
Completed in 2015
|
ESIA
|
ShukhinThar Jetty Project
- Thaketa Township, Yangon Region
|
Myatnothu Co., Ltd
|
Initial Environmental Examination
|
Completed in 2015
|
ESIA
|
Concrete Production Project
- Thaketa Township, Yangon Region
|
High Tech Concrete Co., Ltd
|
Initial Environmental Examination
|
Completed in 2015
|
ESIA
|
Timber Factory Project
- Kyimyindine Township,
Yangon Region
|
Manawphyu Co., Ltd
|
Initial Environmental Examination
|
Completed in 2015
/td>
|
ESIA
|
Flood Mitigation of Yangon City
Downtown Area
- Puzuntaung , Botahtaung ,
Kyauktada, Pabetan, Latha and
Lamadaw Tsps, Yangon Region
|
Yangon City Development Committee
|
Topographic Survey Work for
existing roads and drains of 6
township of Yangon City
Preliminary Design of Storm
Water Drains and other related
Structures
|
Completed in 2015
|
SI & PD
|
Drainage Assessment for HAGL
Myanmar Plaza Development
- Yankin Tsp, Yangon Region
|
HAGL Co., Ltd
|
Design of Storm Water Drains and other related Structures
|
Completed in 2015
|
PD
|
Kyaington Hydropower Project
- Kyaington Township,
East Shan State
|
Kyaington Electrical Co., Ltd.
|
Topographic Survey, Hydrological Investigation and Geological Investigation
|
Completed in 2015
|
SI
|
Kyauk Phyu Reservoir Project
- Yakhine State
|
GE
|
Topographical, Hydrological and Geological Investigation, Reservoir and Spillway Design and Cost Estimate
|
Completed in 2015
|
SI & PD
|
Twingyi Pump Irrigation Project
|
WRUD, MOAI
|
Topographic Survey and Design of Pump Irrigation System
|
Completed in 2015
|
SI & PD
|
Monywa Drainage Survey Project
- Monywa Township, Sagaing Region
|
Monywa Township Development Committee
|
Topographic Survey
|
Completed in 2015
|
SI
|
Drainage Projects for (2012-2016)
- Thanlyin Township
- Kyi Su Village
- Zawtika Housing
- Kyibwaye Housing
- Dagon Seikkan Township
- Lower Price Building
- Nyaung Ywa
- Dine Su, Hlaingtharyar Township
- Shwe Lin Ban, Hlaingtharyar Township
- Kyan Pyo, Hlaingtharyar Township
- Yuzana Housing, South Dagon Township
- Kyar Gyi, South Dagon Township
- Aye Yar Wun Housing, Dagon Seikkan Township
- Yoma Housing
Yangon Region
- Ohn Mar Dandee
Pathein Township, Ayeyarwady Region
|
Department of Human Settlement and Housing Development
|
Investigation and Conceptual Design for Drainge and Flood Control System
|
Completed in 2015
|
SI & PD
|
ESIA works on Mawlamyine
Clean Tap Water Supply Project
- Mawlamyine, Mon State
|
TTW (Thai Tap Water) Public Company Limited of Thailand
|
Environmental and Social Impact Assessment
|
Completed in Jan 2016
|
ESIA
|
Manufacturing of Electrical
Switchgear and Control Panel
Project
- Ngwepinlel Industrial Zone,
Yangon Region
|
Myanmar Young In Co., Ltd.
|
Initial Environmental Exemination
|
Completed in Jan 2016
|
ESIA
|
Soap Factory Project
- Hlaing Township, Yangon Region
|
Myat Miba Company Limited, Myanmar
|
Environmental and Social Impact Assessment
|
Completed in May 2016
|
ESIA
|
Danyingone Fruits, Vegetables
and Flowers Wholesale Market
- Insein Township, Yangon Region
|
Myanmar Agro Exchange Public Limited
|
Environmental and Social Impact Assessment
|
Completed in Aug, 2016
|
ESIA
|
Myanmar Irrigated Command
Area Development PPTA
- Pyawbwe & Natmauk Township,
Magway Region
|
Mott-Macdonald, England
|
Topographic Survey Work for Rehabilitation of Existing Canals and Hydraulic Structures
|
Completed in Sep, 2016
|
SI & IC
|
Soft Drinks Factory Project
- Yangon Industrial Zone,
Yangon Region
|
Asia Pacific Beverages Myanmar Company Limited
|
Initial Environmental Examination
|
Completed in Oct 2016
|
ESIA
|
Cement Plant Project
- Kyaikmayaw Township,
Mon State
|
June Cement Industry Limited
|
Drainage Design and Channel Design for Water Way
|
Completed in Nov 2016
|
PD
|
Kalaw Resort Project Drainage
System
- Kalaw, Shan State
|
Royal Myanmar Co.,Ltd.
|
Kalaw Hill Resort Project Drainage System Design
|
Completed in 2016
|
PD
|
Taunggyi Bus Terminal Project
Drainage System
- Taunggyi, Shan State
|
Golden Integrity Co., Ltd.
|
Taunggyi Bus Terminal Project Drainage System Design
|
Completed in 2016
|
PD
|
Kalaw Hill Estate Project for Two
Major Outfall Drains Design
- Kalaw, Shan State
|
Waminn Group of Companies
|
Two Major Outfall Drains Design
|
Completed in 2016
|
PD
|
Land Leveling, Road and Block
Formation, Detail Drainage
Design for Happy Kit Toy in Bago
Factory Industrial Zone
- Bago, Bago Region
|
Amenity Design Group
|
Land Leveling, Road and Block Formation, Detail Drainage Design
|
Completed in 2016
|
PD
|
Plot No. 19, Thilawa Port Project
- Kyauktan Township, Yangon Region
|
New Day Energy Co., Ltd.
|
Land Grading, Fencing, Gate House, Retaining Wall, Drainage Design and Quality Control
|
Completed in 2016
|
PD
|
Salingon, Anyar Daw and
Kyauktagar Project
- Myaing Township, Magway Region
|
Oisca of Japan
|
Renovation of Existing Dam and Canal
|
Completed in 2016
|
IC
|
Dry Port Project at YwaThaGyi
- Ywathagyi, Yangon Region
|
Resources Group Logistics Co., Ltd
|
Initial Environmental Examination
|
Completed in 2016
|
ESIA
|
Myitnge Dry Port Project
- Myitnge, Mandalay Region
|
KLN Singapore Ltd
|
Initial Environmental Examination
|
Completed in 2016
|
ESIA
|
The Construction of a modern
Multi-purpose international wharf
and integrated agriculture
processing facilities and
associated utility buildings at
Thilawa SEZ (Special Economic
Zone), Plots 20, 21 and triangle
area between Plots 21and 22.
- Thilawa SEZ (Special Economic
Zone), Yangon Region
|
Wilmar Investment Holdings, Pte. ltd., Singapore
|
EIA and SIA works with RAP(Resettlement Action Plan)
|
Completed in 2016
|
ESIA
|
Mawtin Water Supply Project
- Ngaputaw Township,
Ayeyarwady Region
|
Myanmar Coffee Company Pte. Ltd.
|
Topographical, Hydrological and Geological Investigation and Dam and Pipeline Design
|
Completed in 2016
|
SI
|
Climate Friendly Agribusiness
Value Chain Sector Project
- Pakokku Township,
Mandalay Region
|
ADB (Asian Development Bank)
|
Topographic Survey Work for Land (Laser Method Land Leveling) for Irrigation and Flood Protection of Ayeyarwady River
|
Completed in Feb, 2017
|
SI & PD
|
Design of Land Preparation,
Drainage Network, Urban Road
System and Detail Drainage
Design of Secondary Central
Business District (Mindhama)
Project (SCBD)
- Mayangon Township,
Yangon Region
|
Myanmar V Pile Co., Ltd
|
Design of Land Preparation, Drainage Network, Urban Road System and Detail Drainage Design
|
June, 2017
|
PD
|
Flood Mitigation Study with
Kandawgyi Retention Lake
- Yangon, Yangon Region
|
Engineering Department (Road and Bridge) Yangon City Development Committee
|
Proposal for Hydrological survey, analysis and Hydraulic Structures Design such as Spillway, Conduit and Garbage & Silt Filter at Kandawgyi Lake.
|
July, 2017
|
SI
|
MinHla Hydropower Project
- Naungcho Township,
Northern Shan State
|
Momentum Co., Ltd.
|
Environmental and Social Impact Assessment
|
July, 2017
|
ESIA
|
Cavern Island Resort Project
- Kawthoung Township,
Tanintharyi Region
|
KMOT Co. Ltd.
|
Environmental and Social Impact Assessment
|
June, 2017
|
ESIA
|
Manufacturing of Electrical
Switch Boards Sheet Metal
Component and Steel Receiver
Project
- South DagonTownship,
Yangon Region
|
CMI Engineering Co., Ltd
|
Initial Environmental Examination
|
January, 2017
|
ESIA
|
Agriculture Income Improvement
Project
- Shwebo, Sagaing Region (Covering
8 Townships)
Thaphanseik Dam, the Largest
Command Area of Myanmar
|
Sanyu Consultants International
|
"Topographic Survey Work and
Soil Science Investigation"
|
November, 2017
|
SI
|
Minhla Hydropower Project
- Naungcho Township,
Shan State
|
Momentum Co., Ltd.
|
Topographical, Hydrological and Geological Investigation. Dam, Weir and Spillway Detailed Design
|
On going
|
SI & PD
|
Pyawt Ywa Pump Irrigation
Project
- Myinmu Township, Sagaing Division
|
International Water
Management Institute
|
To implement a research project
|
On going
|
SI
|
EIA on Nawa Reservoir Project
- Mong Yai Township,
Northern Shan State
|
Livestock and Irrigation
IWUMD
Shan State (North)
|
Impoundment of runoff water by constructing an earthen dam across the Nawa Stream to distribute water for Mong Yai down town area and nearby villages with drinking, domestic and agricultural water supply.
EIA works on Project.
|
Jnuary, 2017
|
ESIA
|
IEE and EMP on Sand to Agri
Project,
Thandwe Township, Rakhine State
|
"Golden Sunflower
"
Energy Co., Ltd.
|
Sand Dredging Activities,
Thandwe River Mouth
IEE and EMP works on Project.
|
Ongoing
|
ESIA
|
EMP work on Concrete Admixture
and Cement Grinding Aids
Project
MyaSeinYaung Industrial Zone,
Hlaing Thayar Township, Yangon
|
FOSROC Co.Ltd.
|
EMP (Environmental Management
Plan) for project implementation.
|
Ongoing
|
ESIA
|